(Created page with "Summary Information * Ownership: Woodside 90% (operator); Tokyo Gas 5%; Kansai Electric 5% * Website: http://www.woodside.com.au * Location: Burrup Peninsula, Western Austral...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Ownership: Woodside 90% (operator); Tokyo Gas 5%; Kansai Electric 5%
 
* Ownership: Woodside 90% (operator); Tokyo Gas 5%; Kansai Electric 5%
Line 7: Line 7:
 
* Status: In operation
 
* Status: In operation
  
+++ Brief Description
+
=== Brief Description ===
* Woodside’s Pluto LNG Project is set to become the fastest developed LNG project from discovery of the gas field in 2005 to first gas from the field in late 2010 and first LNG in early 2011.
+
* Pluto LNG processes gas from the offshore Pluto and Xena gas fields in Western Australia. Gas is piped through a 180 km trunkline to a single onshore LNG-processing train
* Approved for development in July 2007, the foundation project will process gas from the Pluto and Xena gas fields, located in the Carnarvon Basin about 190 km north-west of Karratha, Western Australia.  
+
* In 2021, Woodside reached final investment decision for an expansion project through the construction of a second gas processing train. Pluto Train 2 would have a capacity of about 5 million tonnes per annum (Mtpa)
* With construction of the foundation project progressing, Woodside is preparing for expansion with a second and third LNG train and pipeline gas facility.  
 
  
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity: two LNG tanks with a combined capacity of 120,000 m³, three smaller condensate tanks
 
* Storage capacity: two LNG tanks with a combined capacity of 120,000 m³, three smaller condensate tanks
 
* Constructor: Phase 1
 
* Constructor: Phase 1
* **Foster Wheeler:** Engineering, procurement, and construction management (EPCm)
+
** '''Foster Wheeler:''' Engineering, procurement, and construction management (EPCm)
* **Freyssinet:** Post-tensioning of LNG tanks  
+
** **Freyssinet:** Post-tensioning of LNG tanks  
* **AusGroup:**  
+
** **AusGroup:**  
  * Mechanical works associated with the installation of structural steel and process piping, installation of mechanical equipment, pre-assembled pipe racks, modules and structures, testing of pipework and associated activities.
+
*** Mechanical works associated with the installation of structural steel and process piping, installation of mechanical equipment, pre-assembled pipe racks, modules and structures, testing of pipework and associated activities.
  * Construction of an Effluent Treatment Plant
+
*** Construction of an Effluent Treatment Plant
  * Onshore painting and insulation
+
*** Onshore painting and insulation
 
* Expansion
 
* Expansion
* **Foster Wheeler / WorleyParsons:** Front-end engineering design (FEED)  
+
** **Foster Wheeler / WorleyParsons:** Front-end engineering design (FEED)  
 
* Licensor:
 
* Licensor:
  
  
+++ Ongoing Projects/Project Status
+
=== Ongoing Projects/Project Status ===
 
* The first LNG cargo is now estimated for March [[[LNG Terminals to be Completed in 2012 | 2012]]]
 
* The first LNG cargo is now estimated for March [[[LNG Terminals to be Completed in 2012 | 2012]]]
 
* The project's budget is A$ 14.9 Billion  
 
* The project's budget is A$ 14.9 Billion  
 
* Woodside is discovering new gas fields in the area, which will support a Phase II expansion project
 
* Woodside is discovering new gas fields in the area, which will support a Phase II expansion project
  
+++ Suppliers / Customers
+
=== Suppliers / Customers ===
 
* Suppliers:  
 
* Suppliers:  
 
  * Woodside's [[[Pluto Gas Field]]] and [[[Xena Gas Field]]]
 
  * Woodside's [[[Pluto Gas Field]]] and [[[Xena Gas Field]]]
Line 42: Line 41:
  
  
+++ History
+
=== History ===
 
* 2005 - Gas discovered
 
* 2005 - Gas discovered
 
* 2007 - Pluto project approved
 
* 2007 - Pluto project approved
Line 55: Line 54:
  
  
+++ Other Information
+
=== Other Information ===
 
* Construction quality issues led to a 6 month delay in commissioning
 
* Construction quality issues led to a 6 month delay in commissioning
 
* The project has the potential to expand to 5 trains. These may include processing facilities for third party gas.  
 
* The project has the potential to expand to 5 trains. These may include processing facilities for third party gas.  
  
+++ Relevant Links
+
=== Links ===
 
# [http://www.woodside.com.au/Our+Business/Pluto/ Pluto Webpage]
 
# [http://www.woodside.com.au/Our+Business/Pluto/ Pluto Webpage]
 
# [http://www.woodside.com.au/NR/rdonlyres/6B6F1FD3-F383-4084-A262-9F3896B87F06/0/PlutoLNGFactsheetQ22010.pdf Project Fact Sheet]
 
# [http://www.woodside.com.au/NR/rdonlyres/6B6F1FD3-F383-4084-A262-9F3896B87F06/0/PlutoLNGFactsheetQ22010.pdf Project Fact Sheet]

Revision as of 14:17, 29 November 2021

Summary Information

  • Ownership: Woodside 90% (operator); Tokyo Gas 5%; Kansai Electric 5%
  • Website: http://www.woodside.com.au
  • Location: Burrup Peninsula, Western Australia
  • Capacity: 4.3 million tons/annum (first Train)
  • Status: In operation

Brief Description

  • Pluto LNG processes gas from the offshore Pluto and Xena gas fields in Western Australia. Gas is piped through a 180 km trunkline to a single onshore LNG-processing train
  • In 2021, Woodside reached final investment decision for an expansion project through the construction of a second gas processing train. Pluto Train 2 would have a capacity of about 5 million tonnes per annum (Mtpa)


Technical Details

  • Storage capacity: two LNG tanks with a combined capacity of 120,000 m³, three smaller condensate tanks
  • Constructor: Phase 1
    • Foster Wheeler: Engineering, procurement, and construction management (EPCm)
    • **Freyssinet:** Post-tensioning of LNG tanks
    • **AusGroup:**
      • Mechanical works associated with the installation of structural steel and process piping, installation of mechanical equipment, pre-assembled pipe racks, modules and structures, testing of pipework and associated activities.
      • Construction of an Effluent Treatment Plant
      • Onshore painting and insulation
  • Expansion
    • **Foster Wheeler / WorleyParsons:** Front-end engineering design (FEED)
  • Licensor:


Ongoing Projects/Project Status

  • The first LNG cargo is now estimated for March [[[LNG Terminals to be Completed in 2012 | 2012]]]
  • The project's budget is A$ 14.9 Billion
  • Woodside is discovering new gas fields in the area, which will support a Phase II expansion project

Suppliers / Customers

  • Suppliers:
* Woodside's [[[Pluto Gas Field]]] and [[[Xena Gas Field]]]
* They are estimated to contain 4.6 trillion cubic feet (Tcf) of dry gas reserves and an additional 0.5 Tcf of contingent resources.
  • Customers:
* The project has 15 year sales contracts for up to 3.75 mtpa with foundation customers and partners Kansai Electric and Tokyo Gas
* Woodside has an agreement for the sale of up to 19 cargoes to Asean LNG Trading Co. Ltd (ALTCO), a subsidiary of Petronas International Corporation Ltd
* Chubu Electric: Approximately 1.5 million tonnes of liquefied natural gas (LNG) over a three year period, from 2014


History

  • 2005 - Gas discovered
  • 2007 - Pluto project approved
  • 2007 - Foster Wheeler/Worley Parsons awarded EPC contract for Train 1
  • 2008 - JBIC awards a US$1 billion loan to the project
  • 2009 - Foster Wheeler/Worley Parsons awarded FEED contract for Train 2 & 3
  • 2011 - Woodside signed an LNG Sale and Purchase Agreement with Asean LNG Trading Co. Ltd (ALTCO), a subsidiary of Petronas International Corporation Ltd, for the supply of uncommitted cargoes
  • 2011 - A significant milestone for the Pluto LNG Project was achieved on Sunday, 6 March 2011 as gas from the Dampier to Bunbury Natural Gas Pipeline was introduced to the Pluto onshore plant
  • 2012 - The project reached ready for start up (RFSU) status and first gas has entered the processing train
  • 2012 - Production starts
  • 2014 - Sales agreement with Chubu Electric


Other Information

  • Construction quality issues led to a 6 month delay in commissioning
  • The project has the potential to expand to 5 trains. These may include processing facilities for third party gas.

Links

  1. Pluto Webpage
  2. Project Fact Sheet
  3. Woodside Increases Equity In Pluto Central Hub Exploration Permit
  4. The Pluto Foundation Project is 95% complete
  5. Freyssinet LNG Tank References
  6. Foster Wheeler Awarded EPCm Contract for LNG Project in Australia
  7. Foster Wheeler Joint Venture with WorleyParsons Awarded Feed Contract for Pluto LNG Expansion
  8. KBR Receives Award for Woodside's Pluto Train 2 and Train 3 LNG Project
  9. AusGroup Awarded AUD$120 million Contract for LNG Project
  10. AusGroup Awarded Additional Contracts for Pluto LNG Project
  11. AusGroup Awarded AU$34 Million Contract
  12. Woodside - Sale of Pluto Uncommitted Cargoes
  13. Countdown to Pluto Start Up Begins
  14. Woodside Discovers Gas at Xeres-1
  15. Woodside, Pluto LNG Cost and Schedule Update
  16. JBIC Loan for Australian LNG Project to Ensure Stable Natural Gas Supply to Japan
  17. Pluto-LNG-Project-Achieves-Ready-for-Start-Up
  18. Pluto Begins LNG Production
  19. Woodside Signs Sales Agreement With Chubu Electric