Difference between revisions of "Plaquemines LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 36: | Line 36: | ||
=== Relevant Links === | === Relevant Links === | ||
+ | # [https://abarrelfull.blogspot.com/2021/12/venture-global-lng-awards-kbr-epc.html Venture Global LNG Awards KBR EPC Contract for Plaquemines LNG Export Facility] | ||
# [https://lng-news.blogspot.com/2021/11/pgnig-will-purchase-more-natural-gas.html PGNiG will purchase more natural gas from Venture Global LNG] | # [https://lng-news.blogspot.com/2021/11/pgnig-will-purchase-more-natural-gas.html PGNiG will purchase more natural gas from Venture Global LNG] |
Revision as of 16:02, 20 December 2021
Contents
Summary Information
- Ownership: Venture Global
- Website: http://venturegloballng.com/
- Location:
- Capacity: 20.0 million tons/annum
- Status: Under Construction
Brief Description
- The terminal will have up to thirty-six 0.626 MTPA liquefaction trains, configured in eighteen blocks, with up to six pre-treatment trains
- There will be up to three ship loading berths for LNG vessels carrying a capacity of up to 185,000 cubic meters and up to four 200,000 cubic meter full containment LNG storage tanks
- Two 720 MW combined cycle gas turbine power plants, including additional 25 MW gas-fired aeroderivative turbines
- A utility dock on the Mississippi River to handle waterborne deliveries of equipment and material during both construction and project operations.
- Gas will be supplied by two 42-inch diameter pipelines, 15 and 12 miles long respectively, that connect to existing interstate natural gas pipelines.
Technical Details
- Storage capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2024
Suppliers / Customers
- Suppliers: Two pipe;ines will supply from the transmission network
- Segment 1, an approximately 15-mile long, 42-inch diameter pipeline and appurtenant facilities, to deliver gas from new interconnections with Tennessee Gas Pipeline and Texas Eastern Transmission Gas Pipeline located offshore, southwest of the terminal site
- Segment 2, a looped section of approximately 12-mile long, 42-inch diameter pipeline and appurtenant facilities, to deliver additional supplies to the terminal from the interconnection with Texas Eastern Transmission Gas Pipeline
- Customers: PGNIG will take 4mn tpa
History
- 2018 - PGNIG signed a contract for 2.5 million tons per annum
- 2021 - PGNIG increased their contract to 4.0 million tons per annum
Other Information
- -