=== Brief Description ===
 
=== Brief Description ===
* -
+
* The terminal will have up to thirty-six 0.626 MTPA liquefaction trains, configured in eighteen blocks, with up to six pre-treatment trains
 +
* There will be up to three ship loading berths for LNG vessels carrying a capacity of up to 185,000 cubic meters and up to four 200,000 cubic meter full containment LNG storage tanks
 +
* Two 720 MW combined cycle gas turbine power plants, including additional 25 MW gas-fired aeroderivative turbines
 +
* A utility dock on the Mississippi River to handle waterborne deliveries of equipment and material during both construction and project operations.
 +
* Gas will be supplied by two 42-inch diameter pipelines, 15 and 12 miles long respectively, that connect to existing interstate natural gas pipelines.
  
 
=== Technical Details ===
 
=== Technical Details ===

Revision as of 15:16, 20 December 2021

Summary Information

  • Ownership: Venture Global
  • Website: http://venturegloballng.com/
  • Location:
  • Capacity: million tons/annum
  • Status: (In Operation / Planned / Under Construction)

Brief Description

  • The terminal will have up to thirty-six 0.626 MTPA liquefaction trains, configured in eighteen blocks, with up to six pre-treatment trains
  • There will be up to three ship loading berths for LNG vessels carrying a capacity of up to 185,000 cubic meters and up to four 200,000 cubic meter full containment LNG storage tanks
  • Two 720 MW combined cycle gas turbine power plants, including additional 25 MW gas-fired aeroderivative turbines
  • A utility dock on the Mississippi River to handle waterborne deliveries of equipment and material during both construction and project operations.
  • Gas will be supplied by two 42-inch diameter pipelines, 15 and 12 miles long respectively, that connect to existing interstate natural gas pipelines.

Technical Details

  • Storage capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2024

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2018 - PGNIG signed a contract for 2.5 million tons per annum
  • 2021 - PGNIG increased their contract to 4.0 million tons per annum