Difference between revisions of "Piltun-Astokhskoye Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Sakhalin Energy Investment Company * Country: Russia * Location: Sakhalin * Production start: 2008 * Partners: * Type: Oil & Gas * Estimated...")
 
 
Line 15: Line 15:
 
* The Piltun-Astokhskoye-B (PA-B), the largest platform of the Sakhalin-2 project, is a drilling, processing and production platform
 
* The Piltun-Astokhskoye-B (PA-B), the largest platform of the Sakhalin-2 project, is a drilling, processing and production platform
 
* The platform topsides weigh over 28.000 tons
 
* The platform topsides weigh over 28.000 tons
* The field produces gas for the [[[Sakhalin Lng Terminal]]]
+
* The field produces gas for the [[Sakhalin LNG Terminal]]
  
 
+++ Contractors
 
+++ Contractors
Line 22: Line 22:
 
* **Samsung Heavy Industries:** Fully integrated deck construction including production and refinery facilities
 
* **Samsung Heavy Industries:** Fully integrated deck construction including production and refinery facilities
 
* **AMEC:**  
 
* **AMEC:**  
* Detailed engineering, project management and construction support
+
** Detailed engineering, project management and construction support
* Construction of 1,600 kilometers of oil and gas pipeline
+
** Construction of 1,600 kilometers of oil and gas pipeline
 
* **Saipem:**
 
* **Saipem:**
* Engineering, procurement, construction and installation of a pipeline system connecting the platform to the shore
+
** Engineering, procurement, construction and installation of a pipeline system connecting the platform to the shore
* Transport and installation of platform topsides
+
** Transport and installation of platform topsides
 
* **ABB Lummus Global:** Design and construction of two modules for the Molikpaq platform
 
* **ABB Lummus Global:** Design and construction of two modules for the Molikpaq platform
  

Latest revision as of 12:09, 14 February 2024

Summary Information

  • Operator: Sakhalin Energy Investment Company
  • Country: Russia
  • Location: Sakhalin
  • Production start: 2008
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Also known as Sakhalin 2 Project
  • The Piltun Astokhskoye Oil And Gas Field is 15 km offshore, in 30 m water depth. It has two platforms, A & B
  • The Molikpaq platform (PA-A), was the first to be installed on the field
  • The Piltun-Astokhskoye-B (PA-B), the largest platform of the Sakhalin-2 project, is a drilling, processing and production platform
  • The platform topsides weigh over 28.000 tons
  • The field produces gas for the Sakhalin LNG Terminal

+++ Contractors

  • **Aker Kvaerner:** Engineering, procurement, management and project services for platform substructure
  • **Samsung Heavy Industries:** Fully integrated deck construction including production and refinery facilities
  • **AMEC:**
    • Detailed engineering, project management and construction support
    • Construction of 1,600 kilometers of oil and gas pipeline
  • **Saipem:**
    • Engineering, procurement, construction and installation of a pipeline system connecting the platform to the shore
    • Transport and installation of platform topsides
  • **ABB Lummus Global:** Design and construction of two modules for the Molikpaq platform

+++ History

  • 2000 - Shell acquired Marathon's stake in the field
  • 2003 - SHI awarded platform contract
  • 2003 - AMEC Awarded Detailed engineering, project management and construction support contract
  • 2004 - Saipem awarded pipeline & installation contracts
  • 2007 - Platform Topsides installed
  • 2008 - Production started

+++ Geology

+++ Links

  1. SHI in Large Shipbuilding Deals
  2. Shell Sakhalin Holdings B.V. And Marathon Sakhalin Limited Asset Swap
  3. ABB wins $100 million Sakhalin oil platform order
  4. Sakhalin contract to Aker Kvaerner
  5. AMEC Awarded US $230 Million Sakhalin II Contract by Shell JV
  6. AMEC SPIE’s Pipeline Business Wins Share Of Russian Project