Difference between revisions of "Pavlodar Refinery"

From A Barrel Full
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Ownership: KazMunaiGas
 
* Ownership: KazMunaiGas
Line 8: Line 8:
 
* Refining Depth: 80%
 
* Refining Depth: 80%
  
+++ Refining Units
+
=== Refining Units ===
  
 
* Atmospheric Distillation
 
* Atmospheric Distillation
Line 18: Line 18:
 
* Sulfur recovery and MEA regeneration unit
 
* Sulfur recovery and MEA regeneration unit
  
+++ Terminal Capacity
+
=== Terminal Capacity ===
  
 
* Crude Oil:  
 
* Crude Oil:  
 
* Refined Products:  
 
* Refined Products:  
  
+++ Crude Supply
+
=== Crude Supply ===
* The refinery is technically-equipped for processing [[West Siberian Crude Oil]] and [[Tyumen Crude Oil]] shipped in by the Omsk-Pavlodar-Shymkent-Chardzhou pipeline, and is not linked by pipeline to western Kazakhstan. .
+
* The refinery is technically-equipped for processing [[West Siberian Crude Oil]] and [[Tyumen Crude Oil]] shipped in by the Omsk-Pavlodar-Shymkent-Chardzhou pipeline, and is not linked by pipeline to western Kazakhstan.  
  
+++ Products Produced
+
=== Products Produced ===
 
* Product mix includes gasoline (A-80, AI-91, AI-92, AI-93 and AI-95), jet fuel, diesel fuel, fuel oil, furnace fuel, liquefied gas, petroleum bitumen and coke.
 
* Product mix includes gasoline (A-80, AI-91, AI-92, AI-93 and AI-95), jet fuel, diesel fuel, fuel oil, furnace fuel, liquefied gas, petroleum bitumen and coke.
  
  
+++ Ongoing Projects
+
=== Projects ===
* See [[Pavlodar Refinery Upgrade Project]]
+
* The [[Pavlodar Refinery Upgrade Project]] was completed in 2018
 
* Reconstruction and modernization with increase of the refinery’s capacity up to 6 million tons per year and oil refining depth to 90%, improvement of quality of oil products to ecological phase-4. The project implementation period is 2011-2013;
 
* Reconstruction and modernization with increase of the refinery’s capacity up to 6 million tons per year and oil refining depth to 90%, improvement of quality of oil products to ecological phase-4. The project implementation period is 2011-2013;
 
* Completion of the reconstruction and modernization of the Oil Refinery will allow to provide the country’s consumers with quality oil products and petrochemicals meeting the requirements of the ecological phases-3, 4, reduce adverse impact on the environment, provide the demand of the country for motor and aviation fuel, increase the total refining capacity to 17.5 mln tons per year
 
* Completion of the reconstruction and modernization of the Oil Refinery will allow to provide the country’s consumers with quality oil products and petrochemicals meeting the requirements of the ecological phases-3, 4, reduce adverse impact on the environment, provide the demand of the country for motor and aviation fuel, increase the total refining capacity to 17.5 mln tons per year
  
+++ Other Information
+
=== Other Information ===
* Pavlodar has been crippled by competition from Russia's Omsk refinery, located 350 km (218 miles) to the north. Deliveries of crude to Pavlodar plummeted after the Omsk refinery expanded its capacity to 30 MT/yr (600,000 b/d).
+
* Pavlodar was negatively impacted by competition from Russia's Omsk refinery, located 350 km (218 miles) to the north. Deliveries of crude to Pavlodar plummeted after the Omsk refinery expanded its capacity to 30 MT/yr (600,000 b/d).
  
+++ History
+
=== History ===
 
* 1978 - Refinery Commissioned
 
* 1978 - Refinery Commissioned
 +
* 2018 - Modernisation completed
  
+++ Relevant Links
+
 
 +
=== Links ===
 
# [[Giprogazoochistka Refinery References]]
 
# [[Giprogazoochistka Refinery References]]
# [[Orghim Refinery References]]
+
# [[ORGHIM Refinery References]]
 
# [http://www.beg.utexas.edu/energyecon/new-era/case_studies/Refining_Sector_in_Kazakhstan.pdf Refining Sector in Kazakhstan]
 
# [http://www.beg.utexas.edu/energyecon/new-era/case_studies/Refining_Sector_in_Kazakhstan.pdf Refining Sector in Kazakhstan]
 
# [http://www.caspianinfo.org/story.php?id=295 The Caspian Information Centre News]
 
# [http://www.caspianinfo.org/story.php?id=295 The Caspian Information Centre News]
 +
# [https://abarrelfull.blogspot.com/2024/01/pocr-will-produce-jet-1-aviation.html POCR will produce Jet A-1 aviation kerosene]
 +
 +
[[category:Refinery]]
 +
[[category:Kazakhstan]]
 +
[[category:KazMunayGas]]

Latest revision as of 15:25, 7 February 2024

Summary Information

  • Ownership: KazMunaiGas
  • Website: http://lang.kmg.kz/page.php?lang=2
  • Location: Pavlodar, north-eastern Kazakhstan, near the Russian border
  • Capacity: 7.5 million tons/annum & 150,000 bbl/day
  • Nelson Complexity:
  • Refining Depth: 80%

Refining Units

  • Atmospheric Distillation
  • Vacuum Distillation
  • FCC
  • Catalytic reforming
  • Hydrogenation
  • Asphalt Unit
  • Sulfur recovery and MEA regeneration unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The refinery is technically-equipped for processing West Siberian Crude Oil and Tyumen Crude Oil shipped in by the Omsk-Pavlodar-Shymkent-Chardzhou pipeline, and is not linked by pipeline to western Kazakhstan.

Products Produced

  • Product mix includes gasoline (A-80, AI-91, AI-92, AI-93 and AI-95), jet fuel, diesel fuel, fuel oil, furnace fuel, liquefied gas, petroleum bitumen and coke.


Projects

  • The Pavlodar Refinery Upgrade Project was completed in 2018
  • Reconstruction and modernization with increase of the refinery’s capacity up to 6 million tons per year and oil refining depth to 90%, improvement of quality of oil products to ecological phase-4. The project implementation period is 2011-2013;
  • Completion of the reconstruction and modernization of the Oil Refinery will allow to provide the country’s consumers with quality oil products and petrochemicals meeting the requirements of the ecological phases-3, 4, reduce adverse impact on the environment, provide the demand of the country for motor and aviation fuel, increase the total refining capacity to 17.5 mln tons per year

Other Information

  • Pavlodar was negatively impacted by competition from Russia's Omsk refinery, located 350 km (218 miles) to the north. Deliveries of crude to Pavlodar plummeted after the Omsk refinery expanded its capacity to 30 MT/yr (600,000 b/d).

History

  • 1978 - Refinery Commissioned
  • 2018 - Modernisation completed


Links

  1. Giprogazoochistka Refinery References
  2. ORGHIM Refinery References
  3. Refining Sector in Kazakhstan
  4. The Caspian Information Centre News
  5. POCR will produce Jet A-1 aviation kerosene