=== Brief Description ===
 
=== Brief Description ===
 
* A small simple refinery. Since July 2012, only the lubricant and asphalt units are operating
 
* A small simple refinery. Since July 2012, only the lubricant and asphalt units are operating
=== Refining Units
+
=== Refining Units ===
 
* CDU
 
* CDU
 
* VDU
 
* VDU
Line 14: Line 14:
 
* * Bitumen Unit
 
* * Bitumen Unit
 
* Sulphur complex
 
* Sulphur complex
 +
 
=== Terminal Capacity ===
 
=== Terminal Capacity ===
 
* Crude Oil:
 
* Crude Oil:

Revision as of 18:38, 16 February 2020

Summary Information

  • Ownership: Paramo, (Unipetrol)
  • Website: http://www.paramo.cz/
  • Location:
  • Capacity: 0.75 million tons/annum & 15,000 bbl/day
  • Nelson Complexity:

Brief Description

  • A small simple refinery. Since July 2012, only the lubricant and asphalt units are operating

Refining Units

  • CDU
  • VDU
  • Diesel Desulphurisation
  • Lubricant Base oil complex
  • * Bitumen Unit
  • Sulphur complex

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The refinery is supplied with raw materials from Unipetrol's other refineries

Products Produced

  • Gasoline, Diesel, Lube Oils, Asphalt

Ongoing Projects

-

Other Information

-

History

  • 1889- First boilers were fitted and the laying of pipelines began in the spring. The basic focus of the enterprise was and still is the processing using atmospheric distillation.
  • 1943- This was supplemented with a vacuum column
  • 1947 - A filtrate distillation plant was added
  • 1955 - A gasoline evaporator was added
  • 1996 - A Diesel HDS unit & sulphur complex were added
  • 2000 - The refinery became part of the Unipretrol Group.
  • 2011 - Diesel HDS unit revamped
  • 2012 - Unipetrol decided to cease processing of crude oil at the refinery, and only continue lubricant and asphalt production