Difference between revisions of "Pardubice Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 7: | Line 7: | ||
=== Brief Description === | === Brief Description === | ||
* A small simple refinery. Since July 2012, only the lubricant and asphalt units are operating | * A small simple refinery. Since July 2012, only the lubricant and asphalt units are operating | ||
− | === Refining Units | + | === Refining Units === |
* CDU | * CDU | ||
* VDU | * VDU | ||
Line 14: | Line 14: | ||
* * Bitumen Unit | * * Bitumen Unit | ||
* Sulphur complex | * Sulphur complex | ||
+ | |||
=== Terminal Capacity === | === Terminal Capacity === | ||
* Crude Oil: | * Crude Oil: | ||
Line 31: | Line 32: | ||
* 1955 - A gasoline evaporator was added | * 1955 - A gasoline evaporator was added | ||
* 1996 - A Diesel HDS unit & sulphur complex were added | * 1996 - A Diesel HDS unit & sulphur complex were added | ||
− | * 2000 - The refinery became part of the | + | * 2000 - The refinery became part of the Unipetrol Group. |
+ | * 2006 - Bitumen unit commissioned | ||
* 2011 - Diesel HDS unit revamped | * 2011 - Diesel HDS unit revamped | ||
* 2012 - Unipetrol decided to cease processing of crude oil at the refinery, and only continue lubricant and asphalt production | * 2012 - Unipetrol decided to cease processing of crude oil at the refinery, and only continue lubricant and asphalt production | ||
+ | |||
=== Links === | === Links === | ||
+ | # [[Poerner Bitumen References]] | ||
# [[Prokop Engineering Refinery References]] | # [[Prokop Engineering Refinery References]] | ||
# [http://www.paramo.cz/miranda2/export/sites/www.paramo.cz/cs/sys/galerie-download/Paramo_AR_2007_EN.pdf 2007 Annual Report] | # [http://www.paramo.cz/miranda2/export/sites/www.paramo.cz/cs/sys/galerie-download/Paramo_AR_2007_EN.pdf 2007 Annual Report] |
Latest revision as of 15:32, 20 November 2023
Contents
Summary Information
- Ownership: Paramo, (Unipetrol)
- Website: http://www.paramo.cz/
- Location:
- Capacity: 0.75 million tons/annum & 15,000 bbl/day
- Nelson Complexity:
Brief Description
- A small simple refinery. Since July 2012, only the lubricant and asphalt units are operating
Refining Units
- CDU
- VDU
- Diesel Desulphurisation
- Lubricant Base oil complex
- * Bitumen Unit
- Sulphur complex
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The refinery is supplied with raw materials from Unipetrol's other refineries
Products Produced
- Gasoline, Diesel, Lube Oils, Asphalt
Ongoing Projects
-
Other Information
-
History
- 1889- First boilers were fitted and the laying of pipelines began in the spring. The basic focus of the enterprise was and still is the processing using atmospheric distillation.
- 1943- This was supplemented with a vacuum column
- 1947 - A filtrate distillation plant was added
- 1955 - A gasoline evaporator was added
- 1996 - A Diesel HDS unit & sulphur complex were added
- 2000 - The refinery became part of the Unipetrol Group.
- 2006 - Bitumen unit commissioned
- 2011 - Diesel HDS unit revamped
- 2012 - Unipetrol decided to cease processing of crude oil at the refinery, and only continue lubricant and asphalt production