Difference between revisions of "Panjin Liaoning Refinery Project"

From A Barrel Full
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
* Ownership:  
+
* Ownership: Saudi Aramco / NORINCO Group / Panjin Sincen
 
* Website:  
 
* Website:  
* Wiki Page:  
+
* Wiki Page: [[Panjin Liaoning Refinery]]
 
* Location:
 
* Location:
* Capacity: million tons/annum & 00,000 bbl/day
+
* Capacity: 15 million tons/annum & 300,000 bbl/day
 
* Nelson Complexity:
 
* Nelson Complexity:
* Project Stage:
+
* Project Stage: Planned
* Expected Completion: 201X
+
* Expected Completion: 2024
* Budget:
+
* Budget: $10 billion
 +
 
 
=== The Project ===
 
=== The Project ===
* Project Type:
+
* Project Type: A greenfield refinery and petrochemicals complex
* Project Summary:
+
* Project Summary: The project will include a 300 thousand barrel per day refinery with a 1.5 million metric tonnes per annum (mmtpa) ethylene cracker and a 1.3 mmtpa PX unit
 
* Main Contractors
 
* Main Contractors
 
**
 
**
 
* Licences
 
* Licences
**  
+
**
 +
 
 
=== Refining Units ===
 
=== Refining Units ===
 
*  
 
*  
Line 22: Line 24:
 
* Refined Products:
 
* Refined Products:
 
=== Crude Supply ===
 
=== Crude Supply ===
-
+
* Saudi Aramco will supply up to 70% of the crude feedstock for the complex
 +
 
 
=== Products Produced ===
 
=== Products Produced ===
 
-
 
-
 
=== History ===
 
=== History ===
* 20
+
* 2019 - Joint venture company created
 +
 
 
=== Other Information ===
 
=== Other Information ===
 
-
 
-
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull.blogspot.com/2021/03/saudi-aramco-signs-agreement-to-form.html Saudi Aramco signs agreement to form largest Sino-Foreign Joint Venture with NORINCO and Panjin Sincen in China]
 
# [https://abarrelfull.blogspot.com/2021/03/saudi-aramco-signs-agreement-to-form.html Saudi Aramco signs agreement to form largest Sino-Foreign Joint Venture with NORINCO and Panjin Sincen in China]

Latest revision as of 12:25, 22 March 2021

Summary Information

  • Ownership: Saudi Aramco / NORINCO Group / Panjin Sincen
  • Website:
  • Wiki Page: Panjin Liaoning Refinery
  • Location:
  • Capacity: 15 million tons/annum & 300,000 bbl/day
  • Nelson Complexity:
  • Project Stage: Planned
  • Expected Completion: 2024
  • Budget: $10 billion

The Project

  • Project Type: A greenfield refinery and petrochemicals complex
  • Project Summary: The project will include a 300 thousand barrel per day refinery with a 1.5 million metric tonnes per annum (mmtpa) ethylene cracker and a 1.3 mmtpa PX unit
  • Main Contractors
  • Licences

Refining Units

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • Saudi Aramco will supply up to 70% of the crude feedstock for the complex

Products Produced

-

History

  • 2019 - Joint venture company created

Other Information

-

Links

  1. Saudi Aramco signs agreement to form largest Sino-Foreign Joint Venture with NORINCO and Panjin Sincen in China