PTSC Lam Son FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • “PTSC Lam Son” is designed with a minimum storage capacity of 350,000 barrels, capable of processing 18,000 barrels per day and working continuously offshore (without dry docking) for ten years.
  • The systems on the FPSO include: power generators, boilers, separator, compressor, water injection, metering, anchor, 5 risers, 2 umbilicals to wellhead platforms and fire-fighting/ life-saving equipment

+++ Contractors

  • **PTSC:** Full project scope, ranging from finance arrangement, engineering, procurement, repair & conversion, commissioning, transportation, offshore installation, to operation & maintenance
  • **Keppel:** FPSO conversion

+++ Status

  • In operation

+++ History

  • 2011 - MOU signed for provision of FPSO
  • 2014 - First production

+++ Other Information

  • -

+++ Links

  1. Head of agreement signed between Lam Son JOC & PTSC for the provision of FPSO for the development of Thang Long – Dong Do field
  2. PTSC Lam Son FPSO Naming Ceremony
  3. Yinson's Floating Production, Storage and Offloading ("FPSO") PTSC Lam Son Starts Production