P-74 FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

Brief Description

  • FPSO P-74 was the first platform completed for the exploration of the pre-salt fields located in the Transfer of Rights region. The platform is capable of producing up to 150,000 barrels/day and of compressing 7 million cubic meters of natural gas/day
  • The vessel is a converted VLCC

Contractors

  • **Norberto Odebrecht / UTC Engenharia:** Hull conversion
  • **Toyo:** EPCI contract to install topsides units
  • **Aibel:** Construction of a total of five modules
  • **GE Oil & Gas:** Supply of gas turbines and electric generators, turbocompression trains and electric motor driven compressors for gas main, export services and CO2 re-injection

Status

  • In operation

History

  • 2012 - Norberto Odebrecht & UTC Engenharia awarded hull conversion contracts
  • 2013 - Toyo awarded topsides contract
  • 2018 - The vessel arrived at the field

+++ Other Information ===

  • -

Links

  1. Petrobras signs agreement to convert platform hulls for transfer of rights areas
  2. GE Oil & Gas Wins US$500 Million Petrobras Contract
  3. Petrobas have signed module construction contracts for P-74 and P-76
  4. TOYO’s Brazil Affiliate Awarded FPSO Topsides Units
  5. New field development project to Aibel
  6. Platform P-74 arrives at the Búzios field, in the Santos Basin pre-salt