Difference between revisions of "Okume and Oveng Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Hess * Country: Equatorial Guinea * Location: Northern Block G, offshore * Production start: 2006 * Partners: * Type: Oil / Gas * Estimated Re...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Operator: | + | * Operator: Trident Energy |
* Country: Equatorial Guinea | * Country: Equatorial Guinea | ||
* Location: Northern Block G, offshore | * Location: Northern Block G, offshore | ||
* Production start: 2006 | * Production start: 2006 | ||
− | * Partners: | + | * Partners: Kosmos |
* Type: Oil / Gas | * Type: Oil / Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Okume Complex is comprised of the **Okume**, **Oveng**, **Ebano** and **Elon** fields which have been developed using a combination of two tension leg platforms and four fixed platforms. | * The Okume Complex is comprised of the **Okume**, **Oveng**, **Ebano** and **Elon** fields which have been developed using a combination of two tension leg platforms and four fixed platforms. | ||
* Production from the fields is gathered at a central processing facility (CPF) located at the shallow water Elon field. From there, a fifteen mile subsea pipeline connects the CPF to the Sendje Ceiba floating production, storage and offloading vessel (FPSO) for storage and offloading of crude production | * Production from the fields is gathered at a central processing facility (CPF) located at the shallow water Elon field. From there, a fifteen mile subsea pipeline connects the CPF to the Sendje Ceiba floating production, storage and offloading vessel (FPSO) for storage and offloading of crude production | ||
Line 15: | Line 15: | ||
* The **Akom field** is a single well subsea tie-back system to the existing tension leg platform | * The **Akom field** is a single well subsea tie-back system to the existing tension leg platform | ||
− | + | === Contractors === | |
* **Samsung:** Fabrication of the Hulls and Topsides for both the TLPs | * **Samsung:** Fabrication of the Hulls and Topsides for both the TLPs | ||
* **Stolt Offshore:** Installation of flexible risers and 116 kms of rigid pipelines between the Okume/Ebano and Oveng Tension Leg Platforms, Elon Satellite Platforms and the Sendje Ceiba FPSO | * **Stolt Offshore:** Installation of flexible risers and 116 kms of rigid pipelines between the Okume/Ebano and Oveng Tension Leg Platforms, Elon Satellite Platforms and the Sendje Ceiba FPSO | ||
Line 24: | Line 24: | ||
* **Heerema Marine Contractors:** Okume Complex CPF Installation | * **Heerema Marine Contractors:** Okume Complex CPF Installation | ||
− | + | === History === | |
* 2001 - Amerada Hess Confirms Okume Discovery Offshore Equatorial Guinea With Okume-2 And Okume-3 Appraisal Wells | * 2001 - Amerada Hess Confirms Okume Discovery Offshore Equatorial Guinea With Okume-2 And Okume-3 Appraisal Wells | ||
* 2002 - Akom field discovered | * 2002 - Akom field discovered | ||
Line 30: | Line 30: | ||
* 2005 - Stolt Offshore awarded subsea contract | * 2005 - Stolt Offshore awarded subsea contract | ||
* 2006 - Oil Production starts | * 2006 - Oil Production starts | ||
+ | * 2017 - Kosmos and Trident acquire Hess's stake | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Samsung Platform References]] | # [[Samsung Platform References]] | ||
# [[Universalpegasus Subsea References]] | # [[Universalpegasus Subsea References]] | ||
Line 46: | Line 47: | ||
# [http://killajoules.wikidot.com/archive:amerada-hess-announces-akom-oil-discovery-offshore-e Amerada Hess Announces Akom Oil Discovery Offshore Equatorial Guinea] | # [http://killajoules.wikidot.com/archive:amerada-hess-announces-akom-oil-discovery-offshore-e Amerada Hess Announces Akom Oil Discovery Offshore Equatorial Guinea] | ||
# [http://killajoules.wikidot.com/blog:4776 Wood Group Mustang Performing Front-End Engineering for Hess' Stampede Tension Leg Platform (TLP)] | # [http://killajoules.wikidot.com/blog:4776 Wood Group Mustang Performing Front-End Engineering for Hess' Stampede Tension Leg Platform (TLP)] | ||
+ | # [https://abarrelfull.blogspot.com/2023/12/hess-completes-sale-of-interests-in.html Hess Completes Sale of Interests in Equatorial Guinea] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Equatorial Guinea]] | ||
+ | [[category:Kosmos]] |
Latest revision as of 10:29, 2 December 2023
Summary Information
- Operator: Trident Energy
- Country: Equatorial Guinea
- Location: Northern Block G, offshore
- Production start: 2006
- Partners: Kosmos
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Okume Complex is comprised of the **Okume**, **Oveng**, **Ebano** and **Elon** fields which have been developed using a combination of two tension leg platforms and four fixed platforms.
- Production from the fields is gathered at a central processing facility (CPF) located at the shallow water Elon field. From there, a fifteen mile subsea pipeline connects the CPF to the Sendje Ceiba floating production, storage and offloading vessel (FPSO) for storage and offloading of crude production
- Hess Corporation decided to tie-in the wells to the Sendje Ceiba FPSO located at the Ceiba Oil Field
- The **Akom field** is a single well subsea tie-back system to the existing tension leg platform
Contractors
- **Samsung:** Fabrication of the Hulls and Topsides for both the TLPs
- **Stolt Offshore:** Installation of flexible risers and 116 kms of rigid pipelines between the Okume/Ebano and Oveng Tension Leg Platforms, Elon Satellite Platforms and the Sendje Ceiba FPSO
- **Modec:** Tension Leg Platforms (TLP)
- **Wood Group Mustang:** FEED and detailed design for the production facilities
- **Universalpegasus:** Akom FEED
- **Kavin Engineering:** Methanol Injection System & Chemical Injection System for the TLP
- **Heerema Marine Contractors:** Okume Complex CPF Installation
History
- 2001 - Amerada Hess Confirms Okume Discovery Offshore Equatorial Guinea With Okume-2 And Okume-3 Appraisal Wells
- 2002 - Akom field discovered
- 2004 - Approval of the Plan of Development by the Republic of Equatorial Guinea
- 2005 - Stolt Offshore awarded subsea contract
- 2006 - Oil Production starts
- 2017 - Kosmos and Trident acquire Hess's stake
Geology
Links
- Samsung Platform References
- Universalpegasus Subsea References
- Kavin Engineering Oil And Gas Processing References
- Equatorial Guinea, Oil Production
- International Protective Coatings Platform References
- Stolt Offshore S.A. Awarded $50 million Contract in Equatorial Guinea
- Amerada Hess Confirms Okume Discovery Offshore Equatorial Guinea With Okume-2 And Okume-3 Appraisal Wells
- Hess Corporation Announces First Oil Production From Okume Complex Offshore Equatorial Guinea
- Successful Completion and Delivery of the Third and Fourth MODEC TLPs
- Amerada Hess Announces Akom Oil Discovery Offshore Equatorial Guinea
- Wood Group Mustang Performing Front-End Engineering for Hess' Stampede Tension Leg Platform (TLP)
- Hess Completes Sale of Interests in Equatorial Guinea