OH3 Oil Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Hassi Berkine Oil Field
  • Destination: Haoudh El Hamra
  • Ownership: Sonatrach
  • Website:
  • Length: 290 kilometres ( miles)
  • Capacity: barrels of oil per day
  • Crude Type:

+++ Brief Description

  • The 290-kilometer pipeline links the Hassi Berkine Oil Field to the dispatching terminal of Haoudh El Hamra, which is located in the Berkine Basin, southeast of Algeria

+++ Pipeline Status

  • In operation

+++ History

  • 2001 - ABB awarded expansion contract

+++ Other Information

  • -

+++ Links

  1. ABB signs contract for the extension of the OH3 pipeline in Algeria