North Idku Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: RWE
  • Country: Egypt
  • Location: Nile Delta
  • Production start:
  • Partners: MOL
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The gas produced is piped to and processed by onshore processing facilities

Contractors

  • **ENPPI:** Engineering services for the platform structure and topside facilities
  • **KWSubsea:**
    • FEED of 10" x 7km infield and 16" x 33km export pipelines and tie-in spools including shore approach design
    • Detailed analysis of lateral buckling and trawling response of exposed 16" gas export and 10" infield flowlines

History

  • 1999 - North Idku Gas Field discovered
  • 2008 - RWE announces field development
  • 2019 - Energean acquired a stake in the field from Edison

Geology

Links

  1. ENPPI Offshore Platform References
  2. MOL achieves success in Egypt finding natural gas reserves
  3. RWE Dea starts offshore gas field development in North Idku
  4. Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.