Difference between revisions of "Norne FPSO"

From A Barrel Full
Jump to navigation Jump to search
 
Line 18: Line 18:
 
* **Aker Solutions:** Pusnes Offloading System
 
* **Aker Solutions:** Pusnes Offloading System
 
* **Emtunga:** Living Quarter Modules
 
* **Emtunga:** Living Quarter Modules
* **Aker Kvaerner:** Modification of Norne Topsides for connection to [[[Alve Gas And Condensate Field]]]  
+
* **Aker Kvaerner:** Modification of Norne Topsides for connection to [[Alve Gas And Condensate Field]]
 
* **ABB:** Electrical Systems
 
* **ABB:** Electrical Systems
  

Latest revision as of 14:27, 12 August 2021

Summary Information

Brief Description

Contractors

  • **Keppel FELS:** Vessel construction
  • **Aker Solutions:** Pusnes Offloading System
  • **Emtunga:** Living Quarter Modules
  • **Aker Kvaerner:** Modification of Norne Topsides for connection to Alve Gas And Condensate Field
  • **ABB:** Electrical Systems

Status

  • In operation

History

  • 1996 - Keppel awarded FPSO contract
  • 2007 - Aker Kvaerner awarded contract for modification of the Norne FPSO topside

Other Information

  • -

Links

  1. NPD, Norne
  2. Emtunga Offshore Platform References
  3. Aker Kvaerner wins contract for modification of Statoil Norne FPSO
  4. ABB FPSO References
  5. Jotun FPSO References
  6. Aker FPSO Pusnes Offloading Systems