Difference between revisions of "Nigeria LNG Terminal Expansion"

From A Barrel Full
Jump to navigation Jump to search
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Ownership:  
+
* Ownership: NNPC (49%), Shell (25.6%), Total (15%) and ENI (10.4%)
 
* Website:  
 
* Website:  
 
* Location:   
 
* Location:   
* Capacity: million tons/annum  
+
* Capacity: 7.6 million tons/annum  
* Status: (In Operation / Planned / Under Construction)
+
* Status: Under Construction
  
 
=== Brief Description ===
 
=== Brief Description ===
Line 23: Line 23:
  
 
=== History ===
 
=== History ===
* -
+
* 2019 - FID for expansion project
  
 
=== Other Information ===
 
=== Other Information ===

Revision as of 16:36, 15 September 2023

Summary Information

  • Ownership: NNPC (49%), Shell (25.6%), Total (15%) and ENI (10.4%)
  • Website:
  • Location:
  • Capacity: 7.6 million tons/annum
  • Status: Under Construction

Brief Description

  • The expansion project will enable the Nigeria LNG Terminal to produce an additional 7.6 Mtpa of LNG, of which 4.2 coming from one new liquefaction train (Train 7), and 3.4 coming from the debottlenecking of existing trains.

Technical Details

  • Storage capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2024

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2019 - FID for expansion project

Other Information

  • -

Links

  1. Eni: Nigeria LNG Expansion Project launched