Nigeria LNG Terminal

From A Barrel Full
Revision as of 10:47, 27 June 2022 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Nigeria LNG Limited * Website: http://www.nlng.com/ * Location: Finima, Bonny Island in Rivers State * Capacity: 22 million tons/annum ++...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Ownership: Nigeria LNG Limited
  • Website: http://www.nlng.com/
  • Location: Finima, Bonny Island in Rivers State
  • Capacity: 22 million tons/annum

+++ Brief Description

  • A very large LNG liquefaction terminal with 6 trains
  • It requires about 3.5 bcf/d feedgas intake at full production.
* Train 1: 2.9 MTPA
* Train 2: 2.9 MTPA
* Train 3: 2.9 MTPA
* Train 4: 4 MTPA
* Train 5: 4 MTPA
* Train 6: 4 MTPA

+++ Technical Details

  • Storage capacity: 3* 84,000 m3
  • Licensor: [[[Lng Terminals Using Air Products Technology | Air Products]]]

+++ Contractors

  • **Trains 1&2:**
* **Saipem, Technip, KBR, JGC:** FEED + EPC
* **Chiyoda:** Train 1&2 - FEED & Acid gas removal
  • **Train 3:**
* **Saipem, Technip, KBR, JGC:** FEED + EPC
  • **Trains 4&5:**
* **Saipem, Technip, KBR, JGC:** FEED + EPC
  • **Train 6:**
* **Saipem, Technip, KBR, JGC:** FEED + EPC
  • **Train 7:**
* **Chiyoda:**FEED


+++ Ownership Details

  • Nigeria LNG is a joint venture company owned by the Federal Republic of Nigeria represented by the Nigerian National Petroleum Corporation (NNPC), Shell Gas B.V, TotalfinaElf and Agip.
  • NNPC owns 49% of the shares in Nigeria LNG Limited.
  • Shell Gas BV owns 25.6% of the shares in Nigeria LNG Limited
  • Total Fina Elf owns 15% the shares in Nigeria LNG Limited
  • Agip owns 10.4% of the shares in Nigeria LNG Limited.

+++ Customers

+++ Suppliers

  • Gas is supplied from a large number of fields including the [[[Akpo Oil Field]]], [[[Amenam Kpono Oil Field]]] & [[[Ofan Oil And Gas Field]]]

+++ History

  • 1995 - A Final Investment Decision (FID) was signed by the Shareholders to build a Liquefied Natural Gas Plant in Finima, Bonny Island in Rivers State.
  • 1995 - A consortium of engineering firms comprising Technip, Snamprogetti, M.V. Kellog and Japan Gas Corporation (TSKJ) was awarded a turnkey Engineering, Procurement and Construction (EPC) contract for the construction of the Plant, the Gas Transmission System and the Residential Area.
  • 1996 - Construction of the plant site commenced
  • 1999 - One of the two trains (Train 2) was completed.
  • 1999 - Contract awarded for Train 3 to a consortium of JGC Corporation and its associates TECHNIP of France, SNAMPROGETTI of Italy, and Kellogg Brown & Root of the U.S
  • 1999 - Production of LNG commenced on September 15.
  • 2000 - The second train of the Base Project, Train 1, came on stream on February 27
  • 2002 - Train 3 came into operations in November
  • 2002 - Agreement signed for construction of trains 4 & 5
  • 2004 - Technip, Snamprogetti, KBR and JGC Corporation awarded EPC for train 6
  • 2005 - NLNGPlus, comprising Trains 4 and 5, came on stream in November (for Train 4) and February 2006 (for Train 5).
  • 2007 - NLNG Six, came on stream in December .

+++ Ongoing Projects

  • Plans for building Train 7 that will lift the total production capacity to over 30 MTPA LNG by 2012, are currently at an advanced stage.

+++ Other Information

  • The Plant is built on 2.27sq. km of largely reclaimed land in Finima, Bonny Island. It currently has six trains in operation.
  • The main elements of the operational plant are:
  • Dedicated gas transmission pipelines passing through over 110 communities
  • Dedicated gas transmission pipelines passing through over 110 communities
  • Three LNG storage tanks with a capacity of 84,200 cubic metres each
  • A common fractionation plant to process LPG
  • Two Condensate storage tanks with a capacity of 36,000 cubic metres each
  • Two 65,000 cubic metre LPG refrigerated tanks (for propane & butane)
  • Ten generators with a total capacity of 400 MW
  • Two LNG export jetties
  • One LPG and Condensate export jetty
  • 23 LNG ships dedicated to NLNG service
  • Two Materials off-loading jetty
  • A residential area covering 2.08sq.km.
  • With the completion of the NLNG Six Project, the Nigeria LNG Plant has an overall capacity of some 22 million tonnes per annum of LNG and 4 million tonnes per annum of LPG.


+++ Relevant Links

  1. [[[Chiyoda LNG References]]]
  2. [[[Saipem LNG References]]]
  3. [[[JGC LNG Tank References]]]
  4. Consortium TSKJ is to Build NLNG's Third Train Expansion Project
  5. Nigeria: construction of two new gas liquefaction trains
  6. JGC and Partners Awarded EPC Contract for Sixth LNG Train in Nigeria