Difference between revisions of "Nigeria LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Ownership: Nigeria LNG Limited * Website: http://www.nlng.com/ * Location: Finima, Bonny Island in Rivers State * Capacity: 22 million tons/annum ++...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Ownership: Nigeria LNG Limited  
 
* Ownership: Nigeria LNG Limited  
Line 6: Line 6:
 
* Capacity: 22 million tons/annum  
 
* Capacity: 22 million tons/annum  
  
+++ Brief Description
+
=== Brief Description ===
  
 
* A very large LNG liquefaction terminal with 6 trains
 
* A very large LNG liquefaction terminal with 6 trains
 
* It requires about 3.5 bcf/d feedgas intake at full production.
 
* It requires about 3.5 bcf/d feedgas intake at full production.
* Train 1: 2.9 MTPA
+
** Train 1: 2.9 MTPA
* Train 2: 2.9 MTPA
+
** Train 2: 2.9 MTPA
* Train 3: 2.9 MTPA
+
** Train 3: 2.9 MTPA
* Train 4: 4 MTPA
+
** Train 4: 4 MTPA
* Train 5: 4 MTPA
+
** Train 5: 4 MTPA
* Train 6: 4 MTPA
+
** Train 6: 4 MTPA
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity: 3* 84,000 m3
 
* Storage capacity: 3* 84,000 m3
 
* Licensor: [[[Lng Terminals Using Air Products Technology | Air Products]]]
 
* Licensor: [[[Lng Terminals Using Air Products Technology | Air Products]]]
  
+++ Contractors
+
=== Contractors ===
  
 
* **Trains 1&2:**
 
* **Trains 1&2:**
* **Saipem, Technip, KBR, JGC:** FEED + EPC
+
** **Saipem, Technip, KBR, JGC:** FEED + EPC
* **Chiyoda:** Train 1&2 - FEED & Acid gas removal
+
** **Chiyoda:** Train 1&2 - FEED & Acid gas removal
 
* **Train 3:**
 
* **Train 3:**
* **Saipem, Technip, KBR, JGC:** FEED + EPC
+
** **Saipem, Technip, KBR, JGC:** FEED + EPC
 
* **Trains 4&5:**
 
* **Trains 4&5:**
* **Saipem, Technip, KBR, JGC:** FEED + EPC
+
** **Saipem, Technip, KBR, JGC:** FEED + EPC
 
* **Train 6:**
 
* **Train 6:**
* **Saipem, Technip, KBR, JGC:** FEED + EPC
+
** **Saipem, Technip, KBR, JGC:** FEED + EPC
 
* **Train 7:**
 
* **Train 7:**
* **Chiyoda:**FEED
+
** **Chiyoda:**FEED
  
  
+++ Ownership Details
+
=== Ownership Details ===
  
 
* Nigeria LNG is a joint venture company owned by the Federal Republic of Nigeria represented by the Nigerian National Petroleum Corporation (NNPC), Shell Gas B.V, TotalfinaElf and Agip.  
 
* Nigeria LNG is a joint venture company owned by the Federal Republic of Nigeria represented by the Nigerian National Petroleum Corporation (NNPC), Shell Gas B.V, TotalfinaElf and Agip.  
Line 44: Line 44:
 
* Agip owns 10.4% of the shares in Nigeria LNG Limited.
 
* Agip owns 10.4% of the shares in Nigeria LNG Limited.
  
+++ Customers
+
=== Customers ===
  
+++ Suppliers
+
=== Suppliers ===
* Gas is supplied from a large number of fields including the [[[Akpo Oil Field]]], [[[Amenam Kpono Oil Field]]] & [[[Ofan Oil And Gas Field]]]
+
* Gas is supplied from a large number of fields including the [[Akpo Oil Field]], [[Amenam Kpono Oil Field]] & [[Ofan Oil And Gas Field]]
  
+++ History
+
=== History ===
  
 
* 1995 - A Final Investment Decision (FID) was signed by the Shareholders to build a Liquefied Natural Gas Plant in Finima, Bonny Island in Rivers State.
 
* 1995 - A Final Investment Decision (FID) was signed by the Shareholders to build a Liquefied Natural Gas Plant in Finima, Bonny Island in Rivers State.
Line 64: Line 64:
 
* 2007 - NLNG Six, came on stream in December .
 
* 2007 - NLNG Six, came on stream in December .
 
   
 
   
+++ Ongoing Projects
+
===  Projects ===
  
 
* Plans for building Train 7 that will lift the total production capacity to over 30 MTPA LNG by 2012, are currently at an advanced stage.  
 
* Plans for building Train 7 that will lift the total production capacity to over 30 MTPA LNG by 2012, are currently at an advanced stage.  
  
+++ Other Information
+
===  Other Information ===
  
 
* The Plant is built on 2.27sq. km of largely reclaimed land in Finima, Bonny Island. It currently has six trains in operation.  
 
* The Plant is built on 2.27sq. km of largely reclaimed land in Finima, Bonny Island. It currently has six trains in operation.  
Line 87: Line 87:
  
  
+++ Relevant Links
+
=== Links ===
  
# [[[Chiyoda LNG References]]]
+
# [[Chiyoda LNG References]]
# [[[Saipem LNG References]]]
+
# [[Saipem LNG References]]
# [[[JGC LNG Tank References]]]
+
# [[JGC LNG Tank References]]
 
# [http://killajoules.wikidot.com/archive:consortium-tskj-is-to-build-nlng-s-third-train-expan Consortium TSKJ is to Build NLNG's Third Train Expansion Project]
 
# [http://killajoules.wikidot.com/archive:consortium-tskj-is-to-build-nlng-s-third-train-expan Consortium TSKJ is to Build NLNG's Third Train Expansion Project]
 
# [http://killajoules.wikidot.com/archive:nigeria:construction-of-two-new-gas-liquefaction-tra Nigeria: construction of two new gas liquefaction trains]
 
# [http://killajoules.wikidot.com/archive:nigeria:construction-of-two-new-gas-liquefaction-tra Nigeria: construction of two new gas liquefaction trains]
 
# [http://killajoules.wikidot.com/archive:jgc-and-partners-awarded-epc-contract-for-sixth-lng JGC and Partners Awarded EPC Contract for Sixth LNG Train in Nigeria]
 
# [http://killajoules.wikidot.com/archive:jgc-and-partners-awarded-epc-contract-for-sixth-lng JGC and Partners Awarded EPC Contract for Sixth LNG Train in Nigeria]

Revision as of 13:25, 17 September 2022

Summary Information

  • Ownership: Nigeria LNG Limited
  • Website: http://www.nlng.com/
  • Location: Finima, Bonny Island in Rivers State
  • Capacity: 22 million tons/annum

Brief Description

  • A very large LNG liquefaction terminal with 6 trains
  • It requires about 3.5 bcf/d feedgas intake at full production.
    • Train 1: 2.9 MTPA
    • Train 2: 2.9 MTPA
    • Train 3: 2.9 MTPA
    • Train 4: 4 MTPA
    • Train 5: 4 MTPA
    • Train 6: 4 MTPA

Technical Details

  • Storage capacity: 3* 84,000 m3
  • Licensor: [[[Lng Terminals Using Air Products Technology | Air Products]]]

Contractors

  • **Trains 1&2:**
    • **Saipem, Technip, KBR, JGC:** FEED + EPC
    • **Chiyoda:** Train 1&2 - FEED & Acid gas removal
  • **Train 3:**
    • **Saipem, Technip, KBR, JGC:** FEED + EPC
  • **Trains 4&5:**
    • **Saipem, Technip, KBR, JGC:** FEED + EPC
  • **Train 6:**
    • **Saipem, Technip, KBR, JGC:** FEED + EPC
  • **Train 7:**
    • **Chiyoda:**FEED


Ownership Details

  • Nigeria LNG is a joint venture company owned by the Federal Republic of Nigeria represented by the Nigerian National Petroleum Corporation (NNPC), Shell Gas B.V, TotalfinaElf and Agip.
  • NNPC owns 49% of the shares in Nigeria LNG Limited.
  • Shell Gas BV owns 25.6% of the shares in Nigeria LNG Limited
  • Total Fina Elf owns 15% the shares in Nigeria LNG Limited
  • Agip owns 10.4% of the shares in Nigeria LNG Limited.

Customers

Suppliers

History

  • 1995 - A Final Investment Decision (FID) was signed by the Shareholders to build a Liquefied Natural Gas Plant in Finima, Bonny Island in Rivers State.
  • 1995 - A consortium of engineering firms comprising Technip, Snamprogetti, M.V. Kellog and Japan Gas Corporation (TSKJ) was awarded a turnkey Engineering, Procurement and Construction (EPC) contract for the construction of the Plant, the Gas Transmission System and the Residential Area.
  • 1996 - Construction of the plant site commenced
  • 1999 - One of the two trains (Train 2) was completed.
  • 1999 - Contract awarded for Train 3 to a consortium of JGC Corporation and its associates TECHNIP of France, SNAMPROGETTI of Italy, and Kellogg Brown & Root of the U.S
  • 1999 - Production of LNG commenced on September 15.
  • 2000 - The second train of the Base Project, Train 1, came on stream on February 27
  • 2002 - Train 3 came into operations in November
  • 2002 - Agreement signed for construction of trains 4 & 5
  • 2004 - Technip, Snamprogetti, KBR and JGC Corporation awarded EPC for train 6
  • 2005 - NLNGPlus, comprising Trains 4 and 5, came on stream in November (for Train 4) and February 2006 (for Train 5).
  • 2007 - NLNG Six, came on stream in December .

Projects

  • Plans for building Train 7 that will lift the total production capacity to over 30 MTPA LNG by 2012, are currently at an advanced stage.

Other Information

  • The Plant is built on 2.27sq. km of largely reclaimed land in Finima, Bonny Island. It currently has six trains in operation.
  • The main elements of the operational plant are:
  • Dedicated gas transmission pipelines passing through over 110 communities
  • Dedicated gas transmission pipelines passing through over 110 communities
  • Three LNG storage tanks with a capacity of 84,200 cubic metres each
  • A common fractionation plant to process LPG
  • Two Condensate storage tanks with a capacity of 36,000 cubic metres each
  • Two 65,000 cubic metre LPG refrigerated tanks (for propane & butane)
  • Ten generators with a total capacity of 400 MW
  • Two LNG export jetties
  • One LPG and Condensate export jetty
  • 23 LNG ships dedicated to NLNG service
  • Two Materials off-loading jetty
  • A residential area covering 2.08sq.km.
  • With the completion of the NLNG Six Project, the Nigeria LNG Plant has an overall capacity of some 22 million tonnes per annum of LNG and 4 million tonnes per annum of LPG.


Links

  1. Chiyoda LNG References
  2. Saipem LNG References
  3. JGC LNG Tank References
  4. Consortium TSKJ is to Build NLNG's Third Train Expansion Project
  5. Nigeria: construction of two new gas liquefaction trains
  6. JGC and Partners Awarded EPC Contract for Sixth LNG Train in Nigeria