Niger Chad Crude Oil Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Agadem bloc, Niger
  • Destination: Chad
  • Ownership:
  • Website:
  • Length: 600 kilometres (373 miles)
  • Capacity: barrels of oil per day
  • Crude Type: Niger

+++ Brief Description

  • About 193 km of the pipeline will link the Agadem bloc to the Chad border. Then another 400 km of pipeline will be built in Chad to connect to the existing Chad-Cameroon Oil Pipeline, for deliveries to the port of Kribi in Cameroon

+++ Pipeline Status

  • Planned

+++ History

  • 2012 - Niger signs MOU with Chad

+++ Other Information

  • -

+++ Links