Difference between revisions of "Naoetsu LNG terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 38: | Line 38: | ||
=== Links === | === Links === | ||
− | # | + | # [[Chiyoda LNG References]] |
− | # | + | # [[Freyssinet LNG Tank References]] |
# [http://killajoules.wikidot.com/archive:construction-of-an-lng-receiving-terminal-at-naoetsu Construction of an LNG receiving terminal at Naoetsu, Japan] | # [http://killajoules.wikidot.com/archive:construction-of-an-lng-receiving-terminal-at-naoetsu Construction of an LNG receiving terminal at Naoetsu, Japan] | ||
# [http://www.inpex.co.jp/english/news/pdf/2011/e20110523-c.pdf Construction Start of Naoetsu LNG Receiving Terminal in Niigata, Japan] | # [http://www.inpex.co.jp/english/news/pdf/2011/e20110523-c.pdf Construction Start of Naoetsu LNG Receiving Terminal in Niigata, Japan] | ||
Line 45: | Line 45: | ||
# [http://killajoules.wikidot.com/blog:4477 Arrival of the First LNG (Liquefied Natural Gas) Carrier at Naoetsu LNG Terminal, Japan] | # [http://killajoules.wikidot.com/blog:4477 Arrival of the First LNG (Liquefied Natural Gas) Carrier at Naoetsu LNG Terminal, Japan] | ||
# [http://killajoules.wikidot.com/blog:4807 Start-up of Naoetsu LNG Terminal, Japan] | # [http://killajoules.wikidot.com/blog:4807 Start-up of Naoetsu LNG Terminal, Japan] | ||
+ | # [https://abarrelfull.blogspot.com/2020/11/first-lng-shipment-from-inpex-operated.html First LNG Shipment from INPEX-operated Ichthys LNG Project Arrives at Naoetsu LNG Terminal, Japan] |
Revision as of 18:48, 15 November 2020
Contents
Summary Information
- Ownership: Inpex
- Website: http://www.inpex.co.jp/
- Location: Naoetsu in Joetsu city, Niigata Prefecture, Japan
- Capacity: 1.5 million tons/annum
- Status: In operation
Brief Description
- The main facilitites of the Terminal include two above-ground LNG tanks with the storage capacity of 180,000kl, a berth which enables the 210,000m3 loading class LNG tanker (Q-flex) to unload, and vaporizers and calorific value adjustment facilities. The Terminal’s capacity to receive and regas LNG is approximately 1.5 million tonnes per year
+++ Technical Details
- Storage capacity: 180,000-kl tank x 2
- Unloading capacity: a berth which enables the 210,000m3 loading class LNG tanker (Q-flex) to unload
- Send out capacity:
- Constructor:
* **Chiyoda:** EPC * **Freyssinet:** Pre-stressing for LNG tanks
+++ Ongoing Projects/Project Status
- The project was completed in December [[[LNG Terminals to be Completed in 2013 | 2013]]]
Suppliers / Customers
- Suppliers: LNG is supplied from the Ichthys LNG Terminal
- Customers: Gas will be supplied mainly to the city gas enterprises and commercial/industrial customers in the Tokyo metropolitan area
+++ History
- 2008 - Project launched with FID
- 2009 - Construction Start of Naoetsu LNG Receiving Terminal
- 2013 - First LNG cargo arrived
- 2013 - Commercial operations began
- 2018 - First cargo from Ichthys
Other Information
- -
Links
- Chiyoda LNG References
- Freyssinet LNG Tank References
- Construction of an LNG receiving terminal at Naoetsu, Japan
- Construction Start of Naoetsu LNG Receiving Terminal in Niigata, Japan
- Financial Results for the six months ended September 30, 2008
- Arrival of the First LNG (Liquefied Natural Gas) Carrier at Naoetsu LNG Terminal, Japan
- Start-up of Naoetsu LNG Terminal, Japan
- First LNG Shipment from INPEX-operated Ichthys LNG Project Arrives at Naoetsu LNG Terminal, Japan