NanBao 35-2 Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: CNOOC
  • Country: China
  • Location:
  • Production start: 2005
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The main development facilities include two platforms and a 29.5 kilometers subsea pipeline
  • The flowing-in crude, after being processed in the platforms, is transported to the Bohai Century FPSO

+++ Contractors

  • BOEC: Deck, Heli-deck, Topside

+++ History

  • 2005 - First oil produced

+++ Geology

+++ Links

  1. Jotun Platform References
  2. CNOOC limited Announces First Production from NB 35-2