NPCC Offshore Project References

From A Barrel Full
Jump to navigation Jump to search
  1. Zuluf Oil Field, Safaniya Oil Field & Berri Oil Field
    • Saudi Aramco Awards a Contract of four Offshore Platforms and Pipelines -2017
    • Saudi Aramco placed its confidence in the National Petroleum Construction Company (NPCC) by awarding a new contract of 4 Offshore Platforms and associated Submarine Pipelines, Cables and Tie Ins for Al Safaniya, Zuluf and Berri Oilfields. This EPC contract includes Engineering, Procurement, Fabrication, Load-out, Transportation, Installation, Hook-up and Pre-commissioning work of 4 Offshore Platforms (SSS Wellhead Decks) with the associated 4 Subsea Pipelines, 3 Submarine Cables and Downstream Tie-ins.
    • Client: ARAMCO
  2. Marjan Oil Field & Berri Oil Field
    • Saudi Aramco Awards 2 Contracts for 17 Offshore Jackets –2017
    • Saudi Aramco awarded 2 new contracts for 17 Offshore Jackets in Berri & Marjan Oilfields to NPCC. These contracts include Engineering, Procurement, Construction, Transportation and Installation of 9 and 8 jackets respectively, and will be completed in 11 months.
    • Client: ARAMCO
  3. Safaniya Oil Field, Marjan Oil Field, Abu Safah Oil Field
    • Aramco awarded 2 projects for 10 & 9 Jackets respectively to NPCC- 2018
    • Aramco awarded 2 projects for 10 & 9 Jackets respectively to NPCC. First project, Project 8239, for 10 Jackets requires NPCC to engineer, procure, fabricate, transport and install in Abu Safah, Safaniyah, Marjan & Lawhah fields in KSA, water depths ranging from 18m to 60m, within a completion period of 360 days.
    • Second project for 9 Jackets requires NPCC to engineer, procure, fabricate, transport and install in Zuluf field in KSA, water depths ranging from 38m to 46m, the project to be completed in one year.
    • Client: ARAMCO
  4. Lower Zakum Oil Field
    • ADMA-OPCO signs AED 3.25 Billion EPC Contract for Lower Zakum Development (Zakum Oil Lines Replacement Project - Phase I) - 2014.
    • ADMA-OPCO signed an EPC contract for the First Phase of Lower Zakum Oil Lines Replacement Project (Phase I) with the NPCC at an approximate value of AED 3.257 billion ($ 885 m).
    • The project is part of ADMA-OPCO's Lower Zakum 100 MBD programme aimed at enhancing the oil production capacity from Lower Zakum Field as part of its overall scheme to raise the company's oil production from the current 600,000 bpd to around one million bpd by 2020.
    • The First Phase of Zakum Oil Lines Replacement Project consists of approximately 90 km of Oil Pipelines replacement and associated Wellhead Towers modification.
    • Client: ADMA-OPCO
  5. Umm Lulu Oil Field
    • EPC Contract for Umm Lulu Full Field Development Project Package-1 - 2013
    • Adma-Opco has signed Dh2.8 billion Engineering, Procurement and Construction, or EPC, contract for Umm Lulu (UL) full field development project package-1 with the NPCC.
    • The EPC work entails the construction and installation of six new well head towers along with a riser platform topside, 90 kilometers long infield pipelines, 125 kilometers long main oil lines, and 100 kilometers long fiber optic Cables. The project involves Brownfield modifications on two existing wellhead towers in UL Field.
    • Client: ADMA-OPCO
  6. Umm Lulu Oil Field
    • EPC Work of Umm Lulu Full Field Development Project – Package 2 - 2013
    • NPCC, in consortium with Technip France Abu Dhabi, has been awarded by ADMA-OPCO, the contract for the EPC Work of Umm Lulu Full Field Development Project – Package 2 (Process Facilities). Throughout the duration of the contract, NPCC will be the consortium leader and be responsible for the overall delivery of the project.
    • The contract was awarded with an approximate value of US Dollars 1.69 Billion, at the conclusion of a competitive bidding process in which many international EPC contractors participated. The contract's scope of work consists of the detailed engineering, procurement, fabrication, offshore installation, commissioning and start-up of a large offshore super complex located in the Umm Lulu Field. The complex will comprise six bridge linked platforms including gathering, separation, gas treatment and water disposal facilities, utilities and accommodation modules. These platforms totaling over 66,000 metric tons will be fabricated at NPCC's yard in Abu Dhabi.
    • Client: ADMA-OPCO
  7. Bukha Gas and Condensate Field
    • EPC Contract for installation of two offshore pipelines in the Musandam area Oman - 2013.
    • A new multiphase offshore pipeline will import well fluids from the Bukha field to Musandam Gas Plant for processing. An offshore export pipeline will also be installed to transport sales gas from Musandam to Saqr Port in Ras Al Khaimah.
    • The two pipelines have a total length exceeding 30 km and will be laid in water depth of up to 90 m. The approximately $40 million contract provides NPCC an entry into the lucrative Omani market and is in line with its expansion strategy.
    • Client: Oman Oil Company Exploration and Production LLC (OOCEP)
  8. Upper Zakum Oil Field
    • UZ-750 Project No. 8383 EPC-1 (Subsea Pipelines, Structures and First Oil Facilities) - 2012
    • NPCC, in consortium with Technip France Abu Dhabi, has been awarded by ZADCO, the contract for the EPC of UZ-750 Project No. 8383 EPC-1 Package. The approximate value of the contract is US Dollars 800 million. The consortium will be led by NPCC.
    • The scope of the contract consists of EPC for Subsea Pipelines, Structures and First Oil Facilities.
    • The contract is for the first phase of Zakum Development Co's (Zadco) expansion at its offshore oil field whose production will rise 100,000 barrels per day (bpd) when completed.
    • Client: ZADCO
  9. Habshan Oil and Gas Field
    • Integrated Gas Development Project - Habshan Platform (HAP) - 2009.
    • The ADMA-OPCO portion involves the challenging offshore portion of gas production by drilling additional gas wells and processing platforms at Umm Shaif for gas dehydration and transfer to Das Island through the new main gas line to be laid under this contract.
    • Client: ADMA-OPCO
  10. Zuluf Oil Field
    • Fabrication and Installation of Tie-in Platforms & Scraper Decks - 2007.
    • Construction Engineering, Fabrication, Transportation, Installation, Hook-up/Tie-ins and Pre-Commissioning for following Facilities:
      • ZULF TP7- Jaket Deck,Bridge and Subsea Spools
      • ZULF TP8- Jaket Deck,Bridge and Subsea Spools
      • MRJN TP6- Scraper Deck
      • ZULF TP5- Scraper Deck
      • ZULF TP6- Scraper Deck
    • Client: Aramco Overseas Company B.V & Saudi Aramco Oil Company (Saudi Aramco)


EPC Contract for Replacement of 20 Nis.Water Injection Lines in Zakum Field and 4 Nos.in Umm Shaif Field - 2007.

Site Survey,Verification of Basic Desgin,Detailed/Construction Engineering ,Procurement, Fabrication,Transportation ,Installation,Testing and Pre-commissioning of 20 New Water Injection Submarine Pipelines at ZK field and 4 Nos.Water Injection Pipelines at US Field including Removal of existing Risers/Installation of New riser Clamps/Risers at Platforms and Associated Topside Modification Works at the existing Platforms.

The EPC work entails the construction and installation of six new well head towers along with a riser platform topside, 90 kilometers long infield pipelines, 125 kilometers long main oil lines, and 100 kilometers long fiber optic Cables. The project involves Brownfield modifications on two existing wellhead towers in UL Field.

Client: ADMA-OPCO


Offshore Associated Gases (OAG),Project No.5241,EPC Package 2 "Offshore Pipeline" - 2007.

Detailed Engineering ,Construction Engineering , Procurement of Line Pipes , Fabrication , Pipe Coating , Transportation , Installation, Testing & Pre-commissioning of 30" OD ,117 Km of Pipeline between the beach valves at Das Island and the beach valve at Habshan Landfall (Ras Al Qila).


Client:


Maersk Oil ,Al Shaheen Development Project 2005 GA Wellhead Module,ED,GD & GB Platforms - 2007

Design,Engineering,Procurement ,Fabrication ,Onshore Commissioning ,Load out ,Sea Fastening Transportation to Company's designated Offshore Location,Installation & Hook-up and Commissioning of the Facilities.


Client: Maersk Oil Qatar


Provision of DLB-1000 for Pipelay,Jacket and Deck Installation works for QP BH & MM fields Offshore Project - 2007.

Installation Engineering ,Welding Procedures ,Provision of Installation Aids,Slings & Shackles and Provision of DLB-1000 Construction Spread Offshore Qatar for a minimum Period of 145 days on day rate basis for the installation of Pipelines and three Wallhead Platforms at Bh& MM Fields Offshore Qatar.


Client: Sime Darby Engineering Sdn.Bhd


C-Series Project - 2006.

Ready for Drilling (RFD) for Well Platforms C-22 & C-39-1


Client: Oil & Natural Gas Corporation Ltd.Mumbai,India


Wellhead Jackets BD,CD,GH,HA & IA and Bridge BA-BD & CA-CD - 2006.

Design , Engineering , Procurement ,Fabrication, Load-out, Sea fastening , Transportation to Offshore Location , Installation there of and Hook-up of the facilities , which include :

BD Wellhead Platform Jacket and Risers BD Wellhead Access Module Bridge Connecting the BD Jacket to the existing BA Platform CD Wellhead Platform Jacket Risers CD Wellhead Access Module Bridge Connecting the DD Jacket to the existing CA Platform GA Wellhead Platform Jacket Risers IA Wellhead Platform Jacket Risers.

Client: Maersk Oil Qatar AS


Hire of Marine Barge Spread-Das Island - 2006.

Hire of Marine Barge Spread for Loading Arm Replacement ,Flare Modification Works and LNG Jetty Strengthening Works.

Client: ADGAS


Offshore Installation of GIP, AN-7 & KK-1 Decks (QPD Offshore Facilities) - 2005.

Installation of GIP, AN-7 & KK! Decks

Client: Qatar Petroleum Development Co.(Japan) Limited.


B&S-NH4 Well Platforms Project-2 - 2005.

Comprises of Surveys (Pre-Engineering ,Pre-Installation and Post-Installation) Design ,Engineering ,Procurement ,Fabrication ,Anticorrosion(for both Rigid and Flexible) & weight Coating (in case of Rigid Pipeline), Load-out,Tie-down/Sea-fastening,Tow-out/Sail-out,Transportion,Installation,Hook-up,Installation of Submarine Pipelines ,Installation of Submarine Cables, modifications on existing Platforms , Testing ,Pre-commissioning ,Commissioning(wherever applicable) of the Facilities stated herein.


Client: Client: Oil & Natural Gas Corporation LTd.,Mumbai,India(ONGC).


Engineering, Procurement and Construction of OGD-III Upstream Project at Bab - 2005.

Upgrade / Modifications to Existing Facilities Upgrade of Gas Producer Well Head Facilities, Upgrade of Existing RMSs (1 to 5), Upgrade of Trunk Line No.5, Upgrade ofInjection Well Head Facilities.

New Gas Gathering System 20 New Production Wells, 4 New Production Trunk Lines, New Flow Lines for New Wells, I New RMS with Launcher & Receiver Area.

New Gas Injection System 12 New Gas Injection Wells and 4 New Injection Trunk Lines.

New Trunklines & Flow lines Production / RE-injection Trunk lines & Flow lines for 6" to 18" = total 368 KM.Demolition & Removal Redundant Facilities.

Client: ADMA-OPCO


USSC Tie-ins (Tie-ins No. 9, 12, 13 & 14) - 2005.

Site Survey, Construction Engineering, Procurement of all Piping/Structural Material, Onshore Fabrication & Testing and Offshore Installation.

Client: ADMA-OPCO


Engineering Procurement and Construction for Qatargas II Developement Project-Offshore Facilities - 2004.

Engineering, Procurement and Construction of Three wellhead platform decks, two export pipelines from platform to onshore facilities in Ras Laffan, two infield subsea pipelines, four cables and other associated works.

Client: Qatar Liquefied Gas Company Limited (II)


ONGC MUT Project - Subsea Pipelaying - 2004.

Subsea Pipelaying of ONGC MUT Project.


Client: Client: Hyundai Heavy Industries Co.Ltd./ ONGCL


Installation of Jacket, Piles, Jacket Appurtenances, Deck, Conductors, Subsea Pipeline, PLEM and SPM System for D1 Well Cum Water Injection Platform Project of M/s. ONCG - 2004.

Installation of Jacket, Piles, Jacket Appurtenances, Deck, Conductors, Subsea Pipeline, PLEM and SPM System for D1 Well Cum Water Injection Platform Project.


Client: Engineering India Limited(EIL) / ONGCL


Anticorrosion Coating on 6" Line Pipes--Bu Hasa Facilities Development Project - 2007.

3 Layer PP on 6 " Line Pipes-670 M.

Client: Snamprogetti


Three Layer PE Coating for Line Pipe for 1694-RAK Gas HDD Diversion Project -2007.

PE Coating on 12 & 16 Pipes : 3.128 M

PE Coating on 12 & 16 Pipes : 3.128 M

Client: Dutco McConnel Dowell


Major Overhaul of COS Tank No.12-Das Island - 2006.

Major Overhaul of COS Tank No.12- Das Island

Client: ADMA-OPCO


Supply of 2 Nos.Process Columns for Onshore Pipeline and Habshan Facilities Package of OAG Project - 2006.

Mechanical Design,Procurement,Fabrication,Inspection,Testing,Painting and Supply Ex-works.

Client: GASCO


Installation of Waste Gas Handling Unit(WGHU) at NGTP,USSC - 2006.

Installation of Waste Gas handling Unit(WGHU) at NGTP,USSC

Client: ADMA-OPCO


Supply of 11 Nos.HP/MP Pressure Vessels for Onshore Pipline and Habshan Facilities Package of OAG Project - 2006.

Mechanical Design,Procurement,Fabrication,Inspection,Testing,Painting and Supply Ex-works

Client: GASCO


OAG Project No.5234--EPC Package3--Onshore Pipeline and Habshan Facilities - 2006.

36"x90 km Pipeline from Ra's Al Qila to Habshan.Habshan Plant Facilities.Substations,Equipment Shelters,Compressor Shelter & O/M Shelter etc.


Client: GASCO


Bu Hasa-Habshan Gas Pipeline Project No.5238-EPC Works - 2006.

36"x50 km Pipeline from Bu Hasa to Habshan, Chemical Injection Package at Bu Hasa, Scraper Receiver & Slug Catcher at Habshan , ECB at Habshan.


Client: GASCO


AGD-II Pipeline Coating - 2006.

Three Layer External Polyethylene Coating of 16" Linepipes of total length approx: 81.70 Km.


Client: zEastern Bechtel Company Ltd / GASCO


Supply of 15 Nos.Incoloy 825/SS 316L Cladded Pressure Vessels - 2006.

Mechanical Design,Procurement,Fabrication,Inspection, Testing,Painting and Supply Ex-works.


Client: Fluor Mideast Ltd.


Supply of 8 Nos.Reactor Vessels - 2006.

Mechanical Design ,Procurement (including Internals and Refractory Lining Material),Fabrication,Inspection,Testing,Painting and Supply Ex-works.


Client: Fluor Mideast Ltd.


Major Overhaul of COS Tank No.20-Das Island - 2006.

Manor Overhaul of COS Tank 20-Das Island.


Client: ADMA-OPCO


Provision of Workforce & Equipment For Above Surface Maintenance Vessel NMS 209 & 208 - 2006.

Provision of Personnel & Equipment to work on Adma-Opco provided Vessel 209.


Client: Abu Dhabi Marine Operating Company


Construction Contract For New SPM Loading Facilities TB-3 Das Island - 2005.

Replacement of existing Turn Table Type CALM Buoy and Associated PLEM and Umbilical with a new Turret-Type CALM Buoy System including PLEM Umbilical .


Client: Abu Dhabi Marine Operations Company (ADMA-OPCO)


Anti-Corrosion and Concrete Coating Works on Sealines ---Dolphin Project - 2005.

3 Layer PP + Concrete Coating (40mm to 90mm ) on 36 Line Pipes-50 KM.


Client: Saipem


FBE Coating of 4" Pipe - 2005.

FBE Coating of 4" Line Pipes (60,000 Ft.)


Client: BP Pakistan Exploration and Production .


Supply of 1 No.New Gas Scrubber (ADMA-CTU) and 1 No.New Feed Gas K.O Drum (ADGAS-LNG Train 3 ) for Das Island HP Feed Gas Conditioning System - 2005.

Mechanical Design , Procurement ,Fabrication , Inspection , Testing , Painting and Supply Ex-Works.


Client: ADGAS.


Hamriyah-SIA Link Project-PE Coating of Pipes - 2005.

PE Coating of 8" Line Pipes


Client: Anabeeb(JV between BP Middle East & Government of Sharjah).


Supply of 3 Nos.Columns & Net Gas Scrubber - 2005.

Mechanical Design,Procurement,Fabrication,Inspection,Testing ,Painting and Supply Ex-works.


Client: CCC--Oman LLC.


Al Ghweifat' Repair Works - 2005.

Leg Repairs on NDC Jack-up Barge Al Ghweifat


Client: National Drilling Company (NDC)


Jackets Fabrication and Load-out ( 3 Nos.) for Panna, mukta and Tapti Field Development - 2005 .

Jackets Fabrication and Load-out ( 3 Nos.)


Client: Clough Projects International PTy Ltd.


Zirku Gas Bypass and Segregation of 30" & 18" Systems - 2005.

Piping Construction Works and Minor Supply of Material


Client: ADMA-OPCO.


New SPM Loading Facilities (TB-6) at Das Island - 2005.

Installation of 48" SPM Loading Line and SPM System


Client: ADMA-OPCO.


Zakum-ETPP Bypass-Das Island - 2005.

Minor Piping Construction Works


Client: ADMA-OPCO


Polyethylene Coating of Line Pipes - 2005.

External 3 layer PE and Internal Epoxy Coating (Optional) of following Line Pipes :

48"x 26.8 mm W.T. : 9.600 m 36"x 21.5 mm W.T. : 350 m 36"x 31.8 mm W.T. : 36 m


Client: Al Jaber Energy Services


CTE & Concrete Coating of 12.75" Line Pipes - 2005.

CTE & Concrete Coating of 12.75" Line Pipes


Client: Gulf Piping Company

<

Major Overhaul of COS Tank No.9-Das Island - 2005.

Normal Tank Overhaul Works


Client: Clough Projects International PTy Ltd.


Zirku Gas Bypass and Segregation of 30" & 18" Systems - 2005.

Perform External Coating and Internal Lining on 12" Pipe 59,400 Meters.


Client: McConnel Dowell.


TAKREER AWARDS US$57 MILLION EPC CONTRACT TO NPCC - 2005.

Carry out the Detailed Engineering, Procurement, Construction, Commissioning and Testing of the OGD III Condensate Storage Tanks Project (Package #5) for Ruwais Refinery


Client: TAKREER.


PE Coating of Pipes - 2005.

PE Coating of 12.75" Line Pipes


Client: ALSA Technical Supplies


PE Coating of Pipes - 2005.

PE Coating of 4" to 12.75" Line Pipes


Client: Van Leeuwen Pipe and Tube


Engineering Works for FRAMO Multiport System Manifold at ASAB RDS-2 - 2004.

Engineering Works for FRAMO Multiport System Manifold at ASAB RDS-2


Client: ADCO


Engineering services for converting Asab Zone "A" (Sb-249) to Water Alternate Gas - 2004.

Engineering services for converting Asab Zone "A" (Sb-249) to Water Alternate Gas


Client: ADCO