Difference between revisions of "Myanmar China Crude Oil Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
Capacity: barrels of oil per day | Capacity: barrels of oil per day | ||
Crude Type: | Crude Type: | ||
− | Brief Description | + | === Brief Description === |
+ | |||
+ | * The Myanmar-China Oil Pipeline project includes a 1,100-kilometer pipeline from Kyaukryu port on the west coast of Myanmar to Kunming, capital of Yunnan Province, a large-scale crude oil unloading wharf and a terminal at Kyaukryu port, with nearby oil storage and transportation facilities | ||
+ | * It supplies the [[Yunnan Kunming Refinery]] | ||
− | |||
=== Pipeline Status === | === Pipeline Status === | ||
Revision as of 08:40, 29 September 2020
Summary Information
Source: Kyaukryu, Myanmar Destination: Kunming, Yunnan Province, China Ownership: CNPC Website: http://www.cnpc.com.cn/ Length: 1,100 kilometres ( miles) Capacity: barrels of oil per day Crude Type:
Brief Description
- The Myanmar-China Oil Pipeline project includes a 1,100-kilometer pipeline from Kyaukryu port on the west coast of Myanmar to Kunming, capital of Yunnan Province, a large-scale crude oil unloading wharf and a terminal at Kyaukryu port, with nearby oil storage and transportation facilities
- It supplies the Yunnan Kunming Refinery
Pipeline Status
- In Operation
History
- 2009 - MOU on constructing, operating and managing the Myanmar-China Oil Pipeline project signed by CNPC and Myanmar Ministry of Energy
- 2012 - Pressure tests performed on the pipeline
- 2015 - Myanmar Section starts trial operation
Other Information
-