Difference between revisions of "Montara Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 23: | Line 23: | ||
+++ Contractors | +++ Contractors | ||
− | * | + | * '''Clough:''' transportation and installation of the 750te Montara Wellhead Platform deck, the 285te mooring buoy with nine associated mooring legs, approximately 26km of infield pipelines, and the 100te Swift subsea manifold |
− | * | + | * '''SCSE:''' Jacket Fabrication |
− | * | + | * '''AusGroup:''' Supply of supervision and labour for the offshore installation of the production platform topside, jacket and offshore pipeline |
− | * | + | * '''Saipem:''' Wellhead platform and sealines |
+ | * '''Thai Nippon Steel & Sumikin:''' | ||
+++ History | +++ History | ||
Line 39: | Line 40: | ||
# [[Saipem Fixed Offshore Production Facilities Project References]] | # [[Saipem Fixed Offshore Production Facilities Project References]] | ||
# [[Shenzhen Chiwan Sembawang Engineering Platform References]] | # [[Shenzhen Chiwan Sembawang Engineering Platform References]] | ||
+ | # [[Thai Nippon Steel & Sumikin Engineering & Construction Platform References]] | ||
# [http://killajoules.wikidot.com/archive:clough-awarded-116m-contract-by-pttep-australasia Clough Awarded $116m Contract by PTTEP Australasia] | # [http://killajoules.wikidot.com/archive:clough-awarded-116m-contract-by-pttep-australasia Clough Awarded $116m Contract by PTTEP Australasia] | ||
# [http://killajoules.wikidot.com/archive:ptteps-subsidiary-signs-share-sales-agreement-to-acq PTTEP’s subsidiary signs Share Sales Agreement to acquire Coogee Resources Limited] | # [http://killajoules.wikidot.com/archive:ptteps-subsidiary-signs-share-sales-agreement-to-acq PTTEP’s subsidiary signs Share Sales Agreement to acquire Coogee Resources Limited] |
Revision as of 17:30, 21 February 2024
Summary Information
- Operator: PTTEP
- Country: Australia
- Location: north-west coast of Australia
- Production start: 2013
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The project incorporates the Montara, Swift and Skua fields which are located approximately 690km West of Darwin in the Ashmore Cartier permit area of the Timor Sea within the AC/L7 and AC/L8 production licences in 80m of water.
- The MDP consists of the following infrastructure:
- An unmanned wellhead platform (WHP) at the Montara field with five (5) wells, three (3) 14 inch Production Risers, two (2) 6 inch Gas Lift Risers and one (1) 12 inch J-Tube;
- Five (5) subsea wells for development of the Skua, Swift and Swallow fields;
- Production flowline system consisting of two (2) 6- inch, one (1) 10 inch and three (3) 14 inch flowlines and associated tie-in spools;
- Gas lift flowline system consisting of one (1) 6 inch and three (3) 4 inch flowlines and associated tie-in spools;
- Three (3) infield control umbilicals and associated flying leads;
- A subsea manifold in the Swift field for comingling the production fluids and distributing the compressed gas and electro-hydraulic services to the subsea wells; and
- The Montara Venture FPSO facility and its associated mooring system located approximately 1.5 km northeast of the WHP.
- Two (2) 10 inch Flexible Production Risers and associated riser bases. One (1) 6 inch Flexible Gas Lift Riser and associated riser base. Two (2) control umbilicals and associated riser bases. One (1) gas compressor for the gas lift system.
+++ Contractors
- Clough: transportation and installation of the 750te Montara Wellhead Platform deck, the 285te mooring buoy with nine associated mooring legs, approximately 26km of infield pipelines, and the 100te Swift subsea manifold
- SCSE: Jacket Fabrication
- AusGroup: Supply of supervision and labour for the offshore installation of the production platform topside, jacket and offshore pipeline
- Saipem: Wellhead platform and sealines
- Thai Nippon Steel & Sumikin:
+++ History
- 2008 - PTT acquired Coogee Resources
- 2009 - An oil leak led to a major fire and Australia's worse oil spill
- 2013 - First oil produced
+++ Geology
+++ Links
- Saipem Fixed Offshore Production Facilities Project References
- Shenzhen Chiwan Sembawang Engineering Platform References
- Thai Nippon Steel & Sumikin Engineering & Construction Platform References
- Clough Awarded $116m Contract by PTTEP Australasia
- PTTEP’s subsidiary signs Share Sales Agreement to acquire Coogee Resources Limited
- AusGroup Secures AUD$12.0 million Contract for Construction Manning Services
- PTTEP report on crude oil and gas leak incident in Australia
- Commencement of Montara Production