Difference between revisions of "Montara Oil Field"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: PTTEP
 
* Operator: PTTEP
 
* Country: Australia
 
* Country: Australia
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The project incorporates the Montara, Swift and Skua fields which are located approximately 690km West of Darwin in the Ashmore Cartier permit area of the Timor Sea within the AC/L7 and AC/L8 production licences in 80m of water.
 
* The project incorporates the Montara, Swift and Skua fields which are located approximately 690km West of Darwin in the Ashmore Cartier permit area of the Timor Sea within the AC/L7 and AC/L8 production licences in 80m of water.
 
* The MDP consists of the following infrastructure:
 
* The MDP consists of the following infrastructure:
Line 22: Line 22:
  
  
+++ Contractors
+
=== Contractors ===
* **Clough:** transportation and installation of the 750te Montara Wellhead Platform deck, the 285te mooring buoy with nine associated mooring legs, approximately 26km of infield pipelines, and the 100te Swift subsea manifold
+
* '''Clough:''' transportation and installation of the 750te Montara Wellhead Platform deck, the 285te mooring buoy with nine associated mooring legs, approximately 26km of infield pipelines, and the 100te Swift subsea manifold
* **SCSE:** Jacket Fabrication
+
* '''SCSE:''' Jacket Fabrication
* **AusGroup:** Supply of supervision and labour for the offshore installation of the production platform topside, jacket and offshore pipeline
+
* '''AusGroup:''' Supply of supervision and labour for the offshore installation of the production platform topside, jacket and offshore pipeline
* **Saipem:** Wellhead platform and sealines
+
* '''Saipem:''' Wellhead platform and sealines
 +
* '''Thai Nippon Steel & Sumikin:''' Wellhead Platform Deck Replacement
  
+++ History
+
=== History ===
 
* 2008 - PTT acquired Coogee Resources
 
* 2008 - PTT acquired Coogee Resources
 
* 2009 - An oil leak led to a major fire and Australia's worse oil spill
 
* 2009 - An oil leak led to a major fire and Australia's worse oil spill
 
* 2013 - First oil produced
 
* 2013 - First oil produced
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[Saipem Fixed Offshore Production Facilities Project References]]
 
# [[Saipem Fixed Offshore Production Facilities Project References]]
 
# [[Shenzhen Chiwan Sembawang Engineering Platform References]]
 
# [[Shenzhen Chiwan Sembawang Engineering Platform References]]
 +
# [[Thai Nippon Steel & Sumikin Engineering & Construction Platform References]]
 
# [http://killajoules.wikidot.com/archive:clough-awarded-116m-contract-by-pttep-australasia Clough Awarded $116m Contract by PTTEP Australasia]
 
# [http://killajoules.wikidot.com/archive:clough-awarded-116m-contract-by-pttep-australasia Clough Awarded $116m Contract by PTTEP Australasia]
 
# [http://killajoules.wikidot.com/archive:ptteps-subsidiary-signs-share-sales-agreement-to-acq PTTEP’s subsidiary signs Share Sales Agreement to acquire Coogee Resources Limited]
 
# [http://killajoules.wikidot.com/archive:ptteps-subsidiary-signs-share-sales-agreement-to-acq PTTEP’s subsidiary signs Share Sales Agreement to acquire Coogee Resources Limited]

Latest revision as of 17:42, 21 February 2024

Summary Information

  • Operator: PTTEP
  • Country: Australia
  • Location: north-west coast of Australia
  • Production start: 2013
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The project incorporates the Montara, Swift and Skua fields which are located approximately 690km West of Darwin in the Ashmore Cartier permit area of the Timor Sea within the AC/L7 and AC/L8 production licences in 80m of water.
  • The MDP consists of the following infrastructure:
    • An unmanned wellhead platform (WHP) at the Montara field with five (5) wells, three (3) 14 inch Production Risers, two (2) 6 inch Gas Lift Risers and one (1) 12 inch J-Tube;
    • Five (5) subsea wells for development of the Skua, Swift and Swallow fields;
    • Production flowline system consisting of two (2) 6- inch, one (1) 10 inch and three (3) 14 inch flowlines and associated tie-in spools;
    • Gas lift flowline system consisting of one (1) 6 inch and three (3) 4 inch flowlines and associated tie-in spools;
    • Three (3) infield control umbilicals and associated flying leads;
    • A subsea manifold in the Swift field for comingling the production fluids and distributing the compressed gas and electro-hydraulic services to the subsea wells; and
    • The Montara Venture FPSO facility and its associated mooring system located approximately 1.5 km northeast of the WHP.
    • Two (2) 10 inch Flexible Production Risers and associated riser bases. One (1) 6 inch Flexible Gas Lift Riser and associated riser base. Two (2) control umbilicals and associated riser bases. One (1) gas compressor for the gas lift system.


Contractors

  • Clough: transportation and installation of the 750te Montara Wellhead Platform deck, the 285te mooring buoy with nine associated mooring legs, approximately 26km of infield pipelines, and the 100te Swift subsea manifold
  • SCSE: Jacket Fabrication
  • AusGroup: Supply of supervision and labour for the offshore installation of the production platform topside, jacket and offshore pipeline
  • Saipem: Wellhead platform and sealines
  • Thai Nippon Steel & Sumikin: Wellhead Platform Deck Replacement

History

  • 2008 - PTT acquired Coogee Resources
  • 2009 - An oil leak led to a major fire and Australia's worse oil spill
  • 2013 - First oil produced

Geology

Links

  1. Saipem Fixed Offshore Production Facilities Project References
  2. Shenzhen Chiwan Sembawang Engineering Platform References
  3. Thai Nippon Steel & Sumikin Engineering & Construction Platform References
  4. Clough Awarded $116m Contract by PTTEP Australasia
  5. PTTEP’s subsidiary signs Share Sales Agreement to acquire Coogee Resources Limited
  6. AusGroup Secures AUD$12.0 million Contract for Construction Manning Services
  7. PTTEP report on crude oil and gas leak incident in Australia
  8. Commencement of Montara Production