Summary Information

  • Ownership: Pemex
  • Website: http://www.pemex.com/
  • Wiki Page: Minatitlan Refinery
  • Location: Minatitlan, Veracruz, Mexico
  • Capacity:
    • Before: 8.45 million tons/annum & 169,000 bbl/day
    • After: 16.0 million tons/annum & 320,000 bbl/day
  • Nelson Complexity:
  • Project Stage: [[[Completed Refinery Projects | Completed]]]
  • Expected Completion: [[[Refinery Projects to be Completed in 2011 | 2011]]]
  • Budget: 42 billion pesos

+++ The Project

  • Project Type: Upgrade
  • Project Summary: Addition of a number of new units to increase capacity and modifications to the existing Hydrodesulfurization of Intermediate Distillates to obtain Ultra Low Sulphur Diesel (ULSD).
  • Main Contractors:
    • **Tecnicas Reunidas** awarded LSTK Contract for Engineering, Procurement and Construction
    • **Uhde** has been awarded a contract for the Engineering Services
    • **INTECSA** has the contract to build most of the units
    • **Axens** North America, Process Licensor,


+++ Refining Units

  • Delayed Coker Unit
  • Vacuum crude oil distillation unit - 60,000 bpd
  • Atmospheric crude oil distillation unit (150.000 BPSD)
  • Fluid catalytic craker complex (42.000 BPSD)
  • Hydrodesulfuration unit (37.000 BPSD)
  • Catalytic hydrogenation - 34.000 BPSD

+++ Terminal Capacity

  • Crude Oil:
  • Refined Products:

+++ Crude Supply

  • Increasing the proportion of heavy oil processed from 33% to 71% with a new refining train processing 100% [[[Maya Crude Oil]]]


+++ Products Produced

  • The project doubles the production of gasoline and reduces sulphur levels to 15 ppm

+++ History

  • 2005 - Tecnicas Reunidas awarded LSTK Contract for Engineering, Procurement and Construction
  • 2011 - Refinery opened by President Felipe Calderón


+++ Other Information

  • The oldest refinery in Latin America


+++ Relevant Links

  1. Vepica Refinery Project References
  2. Uhde Downstream Oil And Gas Projects
  3. Minatitlán Refinery Reconfiguration Packet 4 Electrical, Instrumentation & Control Works, Mexico
  4. Construction Of New Refinery Units
  5. Speech by President Felipe Calderón at the opening event of the reconfiguration of the refinery "General Lázaro Cárdenas
  6. Tecnicas Reunidas Projects