Difference between revisions of "Mejillones LNG Import Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: GNL Mejillones (GDF SUEZ, Codelco) * Website: http://www.gnlm.cl/ * Location: North of Chile * Capacity: million tons/annum * Statu...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 12: | Line 12: | ||
* Following the completion of the second tank, this was no longer necessary | * Following the completion of the second tank, this was no longer necessary | ||
− | + | === Technical Details === | |
* Storage capacity: 175,000 M3 + 187,000 m3 | * Storage capacity: 175,000 M3 + 187,000 m3 | ||
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: 5.5 million m3 per day | * Send out capacity: 5.5 million m3 per day | ||
* Constructor: | * Constructor: | ||
− | + | ** **Tractebel:** Design of BOG Recondenser | |
Line 25: | Line 25: | ||
* 2014 - Second LNG tank completed | * 2014 - Second LNG tank completed | ||
− | + | === Ongoing Projects/Project Status === | |
− | * The project was completed in July [[ | + | * The project was completed in July [[LNG Terminal Projects Completed in 2010 | 2010]] |
+++ Suppliers / Customers | +++ Suppliers / Customers |
Latest revision as of 10:44, 21 January 2022
Summary Information
- Ownership: GNL Mejillones (GDF SUEZ, Codelco)
- Website: http://www.gnlm.cl/
- Location: North of Chile
- Capacity: million tons/annum
- Status: In operation
+++ Brief Description
- The Terminal is rated regasification 5.5 million m3 per day of natural gas, thereby allowing power generation to 1,100 MW in the SING.
- The terminal had the BW GDF SUEZ LNG carrier Brussels, which operated for a period of three years as a floating storage unit (FSU) and has a nominal capacity of 162,400 m3 of LNG (equivalent to 97.4 million m3 of natural gas)
- Following the completion of the second tank, this was no longer necessary
Technical Details
- Storage capacity: 175,000 M3 + 187,000 m3
- Unloading capacity:
- Send out capacity: 5.5 million m3 per day
- Constructor:
- **Tractebel:** Design of BOG Recondenser
+++ History
- 2008 - Contruction starts
- 2010 - Terminal enters operations
- 2014 - Second LNG tank completed
Ongoing Projects/Project Status
- The project was completed in July 2010
+++ Suppliers / Customers
- Suppliers:
- Customers:
+++ Other Information
- -