(Created page with "=== Summary Information === * Ownership: GNL Mejillones (GDF SUEZ, Codelco) * Website: http://www.gnlm.cl/ * Location: North of Chile * Capacity: million tons/annum * Statu...")
 
Line 12: Line 12:
 
* Following the completion of the second tank, this was no longer necessary
 
* Following the completion of the second tank, this was no longer necessary
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity: 175,000 M3 + 187,000 m3  
 
* Storage capacity: 175,000 M3 + 187,000 m3  
 
* Unloading capacity:
 
* Unloading capacity:
 
* Send out capacity: 5.5 million m3 per day  
 
* Send out capacity: 5.5 million m3 per day  
 
* Constructor:  
 
* Constructor:  
* **Tractebel:** Design of BOG Recondenser
+
** **Tractebel:** Design of BOG Recondenser
  
  

Revision as of 10:43, 21 January 2022

Summary Information

  • Ownership: GNL Mejillones (GDF SUEZ, Codelco)
  • Website: http://www.gnlm.cl/
  • Location: North of Chile
  • Capacity: million tons/annum
  • Status: In operation

+++ Brief Description

  • The Terminal is rated regasification 5.5 million m3 per day of natural gas, thereby allowing power generation to 1,100 MW in the SING.
  • The terminal had the BW GDF SUEZ LNG carrier Brussels, which operated for a period of three years as a floating storage unit (FSU) and has a nominal capacity of 162,400 m3 of LNG (equivalent to 97.4 million m3 of natural gas)
  • Following the completion of the second tank, this was no longer necessary

Technical Details

  • Storage capacity: 175,000 M3 + 187,000 m3
  • Unloading capacity:
  • Send out capacity: 5.5 million m3 per day
  • Constructor:
    • **Tractebel:** Design of BOG Recondenser


+++ History

  • 2008 - Contruction starts
  • 2010 - Terminal enters operations
  • 2014 - Second LNG tank completed

+++ Ongoing Projects/Project Status

  • The project was completed in July [[[Lng Terminal Projects To Be Completed In 2010 | 2010]]]

+++ Suppliers / Customers

  • Suppliers:
  • Customers:

+++ Other Information

  • -

Links

  1. Start of the LNG terminal construction at Mejillones
  2. Project Details from Hydrocarbon Technologies
  3. Start of the LNG terminal construction at Mejillones
  4. Opening of LNG Regasification Terminal Mejillones
  5. GDF SUEZ inaugurates on-shore LNG storage tank in Chile