Difference between revisions of "Mathura Refinery"

From A Barrel Full
Jump to navigation Jump to search
 
Line 38: Line 38:
 
* 2006 - Isomerization Unit commissioned
 
* 2006 - Isomerization Unit commissioned
 
* 2007 - Axens selected for FCC gasoline treatment
 
* 2007 - Axens selected for FCC gasoline treatment
 +
* 2007 - Bitumen unit revamp completed
 
* 2016 - Construction of OCTAMAX unit launched
 
* 2016 - Construction of OCTAMAX unit launched
 
* 2017 - CB&I awarded licence for residue hydrocracker
 
* 2017 - CB&I awarded licence for residue hydrocracker
 +
 
=== Links ===
 
=== Links ===
 +
# [[Daelim Oil And Gas Projects]]
 
# [[Engineers India Refining References]]
 
# [[Engineers India Refining References]]
 +
# [[Poerner Bitumen References]]
 
# [[Punj Lloyd Refining References]]
 
# [[Punj Lloyd Refining References]]
# [[Daelim Oil And Gas Projects]]
 
 
# [http://killajoules.wikidot.com/archive:uop-and-iocl-start-up-first-penex-tm-process-technol UOP and IOCL Start-up First Penex(TM) Process Technology Isomerization Unit in India; UOP technology to help meet India's clean fuel specifications]
 
# [http://killajoules.wikidot.com/archive:uop-and-iocl-start-up-first-penex-tm-process-technol UOP and IOCL Start-up First Penex(TM) Process Technology Isomerization Unit in India; UOP technology to help meet India's clean fuel specifications]
 
# [http://killajoules.wikidot.com/archive:india-expands-clean-fuels-programs India Expands Clean Fuels Programs]
 
# [http://killajoules.wikidot.com/archive:india-expands-clean-fuels-programs India Expands Clean Fuels Programs]

Latest revision as of 14:19, 20 November 2023

Summary Information

Brief Description

  • A medium sized medium complexity refinery

Refining Units

  • Atmospheric Distillation
  • Vacuum Distillation
  • Hydrocracker
  • FCC
  • Isomerization Unit
  • Diesel Desulphurisation
  • Prime-G+ unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • LPG, Gasoline, Diesel

Projects

Other Information

-

History

  • 1982 - The refinery is commissioned with 6 million TPA capacity
  • 1989 - Revamp of Refinery to increase capacity from 6 to 7.5 Million TPA
  • 1996 - 26,000 TPA Propylene Recovery Unit commissioned
  • 1997 - 500,000 TPA Catalytic Reformer commissioned
  • 1998 - FCC Unit Revamped
  • 2000 - 1.0 mtpa DHDS & 1.2 mtpa Hydrocracker commissioned
  • 2004 - CDU revamped to reduce costs
  • 2006 - Isomerization Unit commissioned
  • 2007 - Axens selected for FCC gasoline treatment
  • 2007 - Bitumen unit revamp completed
  • 2016 - Construction of OCTAMAX unit launched
  • 2017 - CB&I awarded licence for residue hydrocracker

Links

  1. Daelim Oil And Gas Projects
  2. Engineers India Refining References
  3. Poerner Bitumen References
  4. Punj Lloyd Refining References
  5. UOP and IOCL Start-up First Penex(TM) Process Technology Isomerization Unit in India; UOP technology to help meet India's clean fuel specifications
  6. India Expands Clean Fuels Programs
  7. MoS (IC), P&NG lays foundation stone of OCTAMAX unit at Mathura Refinery
  8. CB&I Announces Residue Upgrading Technology Award - First Ever Unit in India