Marmara LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Botas
  • Website: http://www.botas.gov.tr/
  • Location: Marmara Ereglisi
  • Capacity: million tons/annum
  • Status: In Operation

+++ Brief Description

  • A medium sized regasification plant

+++ Technical Details

  • Storage capacity: 3 tanks of capacity 85,000 m^^3^^ each
  • Unloading capacity:
  • Send out capacity: 685.000 cum/hr
  • Constructor:
    • **CB&I**
    • **Tractebel:** Project Management / Engineering Supervision / Construction Management and Supervision / Test, Commissioning and Start-up / Assistance to Operation
    • **Freyssinet:** Pre-stressing for LNG tanks


+++ History

  • 1994 - Terminal starts operations
  • 1998 - Project launched for 3 vapouriser

+++ Ongoing Projects/Project Status

  • -

+++ Suppliers / Customers

  • Suppliers: LNG is sourced from Nigeria and Algeria
  • Customers: The national grid

+++ Other Information

  • -

Links

  1. Freyssinet LNG Tank References
  2. Tractebel Engineering LNG References
  3. Saipem LNG References
  4. Botas 2008 Annual Report
  5. CB&I LNG References