Difference between revisions of "Marjan Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 24: | Line 24: | ||
==== Marjan Increment Program ==== | ==== Marjan Increment Program ==== | ||
* McDermott/COOEC: Engineering, procurement, construction and installation (EPCI) of the Gas-Oil Separation Plant (GOSP) | * McDermott/COOEC: Engineering, procurement, construction and installation (EPCI) of the Gas-Oil Separation Plant (GOSP) | ||
− | + | * McDermott: Engineering, procurement, construction and installation (EPCI) of offshore gas facilities and pipelines | |
=== History === | === History === | ||
Line 40: | Line 40: | ||
# [https://abarrelfull.blogspot.com/2023/01/saudi-aramco-awards-contracts-valued-at.html Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity] | # [https://abarrelfull.blogspot.com/2023/01/saudi-aramco-awards-contracts-valued-at.html Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity] | ||
# [https://abarrelfull.blogspot.com/2023/01/mcdermott-awarded-record-epci-mega.html McDermott Awarded Record EPCI Mega-Project by Saudi Aramco for Marjan Package] | # [https://abarrelfull.blogspot.com/2023/01/mcdermott-awarded-record-epci-mega.html McDermott Awarded Record EPCI Mega-Project by Saudi Aramco for Marjan Package] | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/mcdermott-awarded-epci-mega-project-by.html McDermott Awarded EPCI Mega-Project by Saudi Aramco for Marjan Package 4] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Saudi Arabia]] | [[category:Saudi Arabia]] | ||
[[category:Saudi Aramco]] | [[category:Saudi Aramco]] |
Revision as of 17:16, 17 January 2023
Contents
Summary Information
- Operator: Saudi Aramco
- Country: Saudi Arabia
- Location: Arabian Gulf
- Production start:
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The offshore field extends into Iranian waters where it is known as Foroozan Oil Field
- There are 3 Gas-Oil Separation Plants (GOSP) in operation on the field
- Associated gas is processed at the Khursaniyah Gas Processing Plant
Marjan Increment Program
- Crude oil production capacity at Marjan will be expanded by 300,000 barrels per day
- A new Tanajib Gas Processing Plant will have a gas processing capacity of 2.5 billion standard cubic feet per day
Contractors
- **HHI:** Platform, Facilities Pile, Bridge
- **McDermott:**
- Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)
- Engineering, procurement, construction, installation (“EPCI”) and replacement of the decks of two existing tie-in platforms, as well as the removal and salvage of existing gas turbine generators, and the installation of two new 115kV subsea power and communication cables.
Marjan Increment Program
- McDermott/COOEC: Engineering, procurement, construction and installation (EPCI) of the Gas-Oil Separation Plant (GOSP)
- McDermott: Engineering, procurement, construction and installation (EPCI) of offshore gas facilities and pipelines
History
- 1967 - Marjan field discovered
- 2019 - Contracts awarded for increment program
Geology
Links
- Hyundai Heavy Industries Platform References
- McDermott Awarded North Dome and PDM Projects for Saudi Aramco
- McDermott Awarded Cable Installation Project for Saudi Aramco
- McDermott Awarded Initial Work for the Marjan Gas Oil Separation Plant (GOSP’s) Power Supply Generation System Offshore Saudi Arabia
- Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity
- McDermott Awarded Record EPCI Mega-Project by Saudi Aramco for Marjan Package
- McDermott Awarded EPCI Mega-Project by Saudi Aramco for Marjan Package 4