Difference between revisions of "Marjan Oil Field"

From A Barrel Full
Jump to navigation Jump to search
Line 24: Line 24:
  
 
=== History ===
 
=== History ===
 +
* 1967 - Marjan field discovered
 
* 2019 - Contracts awarded for increment program
 
* 2019 - Contracts awarded for increment program
  

Revision as of 16:38, 17 January 2023

Summary Information

  • Operator: Saudi Aramco
  • Country: Saudi Arabia
  • Location: Arabian Gulf
  • Production start:
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

Marjan Increment Program

  • Crude oil production capacity at Marjan will be expanded by 300,000 barrels per day
  • A new Tanajib Gas Processing Plant will have a gas processing capacity of 2.5 billion standard cubic feet per day

Contractors

  • **HHI:** Platform, Facilities Pile, Bridge
  • **McDermott:**
    • Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)
    • Engineering, procurement, construction, installation (“EPCI”) and replacement of the decks of two existing tie-in platforms, as well as the removal and salvage of existing gas turbine generators, and the installation of two new 115kV subsea power and communication cables.


History

  • 1967 - Marjan field discovered
  • 2019 - Contracts awarded for increment program

Geology

Links

  1. Hyundai Heavy Industries Platform References
  2. McDermott Awarded North Dome and PDM Projects for Saudi Aramco
  3. McDermott Awarded Cable Installation Project for Saudi Aramco
  4. McDermott Awarded Initial Work for the Marjan Gas Oil Separation Plant (GOSP’s) Power Supply Generation System Offshore Saudi Arabia
  5. Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity