Marine XII Floating LNG Terminal

From A Barrel Full
Revision as of 08:34, 26 April 2023 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Ownership: ENI
  • Website: https://www.eni.com/
  • Location: Congo
  • Capacity: 3.0 million tons/annum
  • Status: Under Construction

Brief Description

  • The development will be made in a modular manner, using multiple floating facilities
  • The source of the gas is the Marine XII Oil and Gas Fields
  • The first stage will involve Tango FLNG, built in 2017, which has a treatment capacity of approximately 3 million standard cubic meters/day and an LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic meters/year)
  • A second vessel will add 2.4 MTPA (million tons per annum). This is expected to enter operation in 2025
  • When fully operational the two vessels will provide volumes in excess of 3 million tons/year (over 4.5 billion cubic meters/year)

Technical Details

  • Storage capacity:
  • Constructor: Wison Heavy Industry for the construction and installation of a Floating Liquefied Natural Gas (FLNG) unit
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2023

Suppliers / Customers

History

  • 2022 - ENI acquires Tango FLNG
  • 2022 - ENI orders a second vessel
  • 2023 - ENI officially launches the project

Other Information

  • -

Links

  1. Eni acquires the Tango FLNG to produce and export LNG from the Republic of Congo
  2. Eni launches a second FLNG project to increase LNG production and export from the Republic of Congo
  3. Eni inaugurates Congo LNG project in the Republic of the Congo