Marica Gas Field

From A Barrel Full
Revision as of 11:28, 28 December 2022 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ENI * Country: Croatia * Location: Adriatic * Production start: * Partners: ENI - 50%, INA - 50% * Type: Gas * Estimated Reserves: * Produc...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: ENI
  • Country: Croatia
  • Location: Adriatic
  • Production start:
  • Partners: ENI - 50%, INA - 50%
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field is located in 69 m water depth in the Adriatic Sea

+++ Contractors

  • **Tecon:** Conceptual, basic and detail structural design of one four legged platform including jacket, deck, well head module
  • **Viktor Lenac:** Gas production platform
  • **Micoperi:**
* Marica ptf. deck, helideck and cold vent installation
* SSIV and spools installation

+++ History

  • 2002 - ENI signed an agreement for the development of the field
  • 2004 - Platform Installed

+++ Geology

+++ Links

  1. Tecon Platform References
  2. Micoperi Offshore And Platform References
  3. Viktor Lenac Platform References
  4. Eni: Start Up Of The Gas Fields In The Offshore of Croatia With Reserves Of 20 Billion Cubic Meters