Line 7: Line 7:
 
* Status: In Operation
 
* Status: In Operation
  
+++ Brief Description
+
=== Brief Description ===
 
* The terminal is built on an 860,000ha site located in the city of Manzanillo in the state of Colima along the mid-western coast of Mexico.  
 
* The terminal is built on an 860,000ha site located in the city of Manzanillo in the state of Colima along the mid-western coast of Mexico.  
 
* The terminal consists of: two 150,000㎘ storage tanks; an LNG gasification and delivery facility with an annual capacity of 3.8 million tons; and a jetty (port facility for ships to dock and unload LNG).  
 
* The terminal consists of: two 150,000㎘ storage tanks; an LNG gasification and delivery facility with an annual capacity of 3.8 million tons; and a jetty (port facility for ships to dock and unload LNG).  
Line 13: Line 13:
  
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity: 2 units, 150,000 m3 per tank  
 
* Storage capacity: 2 units, 150,000 m3 per tank  
 
* Unloading capacity: Jetty for LNG vessel receiving LNG vessel of capacity between 70,000 up to 216,000 m3  
 
* Unloading capacity: Jetty for LNG vessel receiving LNG vessel of capacity between 70,000 up to 216,000 m3  
 
* Send out capacity: 3.80 MM Ton/year
 
* Send out capacity: 3.80 MM Ton/year
 
* Constructor:  
 
* Constructor:  
* **Samsung Engineering:** EPC
+
** **Samsung Engineering:** EPC
* **Freyssinet:** Pre-stressing for LNG tanks  
+
** **Freyssinet:** Pre-stressing for LNG tanks  
* **Tractebel:** Engineering services for LNG operations and maintenance
+
** **Tractebel:** Engineering services for LNG operations and maintenance
  
  
+++ Ongoing Projects/Project Status
+
=== Ongoing Projects/Project Status ===
* The project was completed in [[[Lng Terminal Projects To Be Completed In 2012 | 2012]]]
+
* The project was completed in [[LNG Terminal Projects Completed in 2012 | 2012]]
* The terminal, won't ramp up to full capacity until 2013
+
* The terminal, didn't ramp up to full capacity until 2013
  
+++ Suppliers/Customers
+
=== Suppliers/Customers ===
* Supply: Peruvian natural gas from the [[[Peru LNG Terminal]]] to be supplied from YPF S.A
+
* Supply: Peruvian natural gas from the [[Peru LNG Terminal]] to be supplied from YPF S.A
 
* Customers:  
 
* Customers:  
* Comision Federal de Electricidad (CFE)  
+
** Comision Federal de Electricidad (CFE)  
* Gas is to be transported to consumers by the [[[Guadalajara Gas Pipeline]]]
+
** Gas is to be transported to consumers by the [[Guadalajara Gas Pipeline]]
  
  
+++ History
+
=== History ===
 
* Mar. 2008 - Signing of Service agreement
 
* Mar. 2008 - Signing of Service agreement
 
* Oct. 2008 - Basic Design (FEED) completion
 
* Oct. 2008 - Basic Design (FEED) completion
 
* 2012 - Terminal receives first cargo
 
* 2012 - Terminal receives first cargo
  
+++ Other Information
+
=== Other Information ===
 
   
 
   
 
* Capacity of Storage tank of LNG: 2 units, 150,000 m3 per tank  
 
* Capacity of Storage tank of LNG: 2 units, 150,000 m3 per tank  

Latest revision as of 15:18, 3 January 2022

Summary Information

  • Ownership: Terminal KMS de GNL (KOGAS, Mitsui, Samsung)
  • Website: http://www.terminalkms.com/en/
  • Location: Manzanillo, Minatitlan, on the Pacific Coast of Mexico
  • Capacity: 3.80 MM Ton/annum
  • Status: In Operation

Brief Description

  • The terminal is built on an 860,000ha site located in the city of Manzanillo in the state of Colima along the mid-western coast of Mexico.
  • The terminal consists of: two 150,000㎘ storage tanks; an LNG gasification and delivery facility with an annual capacity of 3.8 million tons; and a jetty (port facility for ships to dock and unload LNG).
  • The project is worth around US$900 million.


Technical Details

  • Storage capacity: 2 units, 150,000 m3 per tank
  • Unloading capacity: Jetty for LNG vessel receiving LNG vessel of capacity between 70,000 up to 216,000 m3
  • Send out capacity: 3.80 MM Ton/year
  • Constructor:
    • **Samsung Engineering:** EPC
    • **Freyssinet:** Pre-stressing for LNG tanks
    • **Tractebel:** Engineering services for LNG operations and maintenance


Ongoing Projects/Project Status

  • The project was completed in 2012
  • The terminal, didn't ramp up to full capacity until 2013

Suppliers/Customers


History

  • Mar. 2008 - Signing of Service agreement
  • Oct. 2008 - Basic Design (FEED) completion
  • 2012 - Terminal receives first cargo

Other Information

  • Capacity of Storage tank of LNG: 2 units, 150,000 m3 per tank
  • Natural Gas Send out after liquefaction: 3.80 MM Ton/year.

Links

  1. Freyssinet LNG Tank References
  2. Tractebel Engineering LNG References
  3. Whessoe Engineering LNG References
  4. Samsung C&T Corporation wins Mexico LNG terminal BOO project
  5. Samsung C&T Completes Manzanillo LNG Terminal
  6. Samsung Information
  7. Repsol Says Mexican Manzanillo LNG Terminal Due Online Q4 2011