Difference between revisions of "Manzanillo LNG terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 7: | Line 7: | ||
* Status: In Operation | * Status: In Operation | ||
− | + | === Brief Description === | |
* The terminal is built on an 860,000ha site located in the city of Manzanillo in the state of Colima along the mid-western coast of Mexico. | * The terminal is built on an 860,000ha site located in the city of Manzanillo in the state of Colima along the mid-western coast of Mexico. | ||
* The terminal consists of: two 150,000㎘ storage tanks; an LNG gasification and delivery facility with an annual capacity of 3.8 million tons; and a jetty (port facility for ships to dock and unload LNG). | * The terminal consists of: two 150,000㎘ storage tanks; an LNG gasification and delivery facility with an annual capacity of 3.8 million tons; and a jetty (port facility for ships to dock and unload LNG). | ||
Line 13: | Line 13: | ||
− | + | === Technical Details === | |
* Storage capacity: 2 units, 150,000 m3 per tank | * Storage capacity: 2 units, 150,000 m3 per tank | ||
* Unloading capacity: Jetty for LNG vessel receiving LNG vessel of capacity between 70,000 up to 216,000 m3 | * Unloading capacity: Jetty for LNG vessel receiving LNG vessel of capacity between 70,000 up to 216,000 m3 | ||
* Send out capacity: 3.80 MM Ton/year | * Send out capacity: 3.80 MM Ton/year | ||
* Constructor: | * Constructor: | ||
− | + | ** **Samsung Engineering:** EPC | |
− | + | ** **Freyssinet:** Pre-stressing for LNG tanks | |
− | + | ** **Tractebel:** Engineering services for LNG operations and maintenance | |
− | + | === Ongoing Projects/Project Status === | |
− | * The project was completed in [[ | + | * The project was completed in [[LNG Terminal Projects Completed in 2012 | 2012]] |
* The terminal, won't ramp up to full capacity until 2013 | * The terminal, won't ramp up to full capacity until 2013 | ||
− | + | === Suppliers/Customers === | |
− | * Supply: Peruvian natural gas from the | + | * Supply: Peruvian natural gas from the [[Peru LNG Terminal]] to be supplied from YPF S.A |
* Customers: | * Customers: | ||
− | + | ** Comision Federal de Electricidad (CFE) | |
− | + | ** Gas is to be transported to consumers by the [[Guadalajara Gas Pipeline]] | |
− | + | === History === | |
* Mar. 2008 - Signing of Service agreement | * Mar. 2008 - Signing of Service agreement | ||
* Oct. 2008 - Basic Design (FEED) completion | * Oct. 2008 - Basic Design (FEED) completion | ||
* 2012 - Terminal receives first cargo | * 2012 - Terminal receives first cargo | ||
− | + | === Other Information === | |
* Capacity of Storage tank of LNG: 2 units, 150,000 m3 per tank | * Capacity of Storage tank of LNG: 2 units, 150,000 m3 per tank |
Revision as of 15:18, 3 January 2022
Contents
Summary Information
- Ownership: Terminal KMS de GNL (KOGAS, Mitsui, Samsung)
- Website: http://www.terminalkms.com/en/
- Location: Manzanillo, Minatitlan, on the Pacific Coast of Mexico
- Capacity: 3.80 MM Ton/annum
- Status: In Operation
Brief Description
- The terminal is built on an 860,000ha site located in the city of Manzanillo in the state of Colima along the mid-western coast of Mexico.
- The terminal consists of: two 150,000㎘ storage tanks; an LNG gasification and delivery facility with an annual capacity of 3.8 million tons; and a jetty (port facility for ships to dock and unload LNG).
- The project is worth around US$900 million.
Technical Details
- Storage capacity: 2 units, 150,000 m3 per tank
- Unloading capacity: Jetty for LNG vessel receiving LNG vessel of capacity between 70,000 up to 216,000 m3
- Send out capacity: 3.80 MM Ton/year
- Constructor:
- **Samsung Engineering:** EPC
- **Freyssinet:** Pre-stressing for LNG tanks
- **Tractebel:** Engineering services for LNG operations and maintenance
Ongoing Projects/Project Status
- The project was completed in 2012
- The terminal, won't ramp up to full capacity until 2013
Suppliers/Customers
- Supply: Peruvian natural gas from the Peru LNG Terminal to be supplied from YPF S.A
- Customers:
- Comision Federal de Electricidad (CFE)
- Gas is to be transported to consumers by the Guadalajara Gas Pipeline
History
- Mar. 2008 - Signing of Service agreement
- Oct. 2008 - Basic Design (FEED) completion
- 2012 - Terminal receives first cargo
Other Information
- Capacity of Storage tank of LNG: 2 units, 150,000 m3 per tank
- Natural Gas Send out after liquefaction: 3.80 MM Ton/year.