Difference between revisions of "Manifa Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Saudi Aramco * Country: Saudi Arabia * Location: Khursaniyah, about 50km northwest from Al Jubail, eastern Saudi Arabia * Production start: 201...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Saudi Aramco | * Operator: Saudi Aramco | ||
* Country: Saudi Arabia | * Country: Saudi Arabia | ||
Line 9: | Line 9: | ||
* Production Volume: 900,000 bpd | * Production Volume: 900,000 bpd | ||
− | + | === Description === | |
* The Manifa field includes dry-land rigs linked by a total of 41 kilometers of causeways with a number of elevated bridges designed to maintain natural water flow in the Manifa Bay and preserving natural marine nurseries. | * The Manifa field includes dry-land rigs linked by a total of 41 kilometers of causeways with a number of elevated bridges designed to maintain natural water flow in the Manifa Bay and preserving natural marine nurseries. | ||
* The crude oil processing facilities have 900,000 bpd capacity | * The crude oil processing facilities have 900,000 bpd capacity | ||
− | + | === Contractors === | |
* **GS E&C Consortium:** Manifa Gas Facilities | * **GS E&C Consortium:** Manifa Gas Facilities | ||
* **Saipem:** EPC (engineering, procurement and construction) of three gas/oil separation trains (GOSP) with a capacity of 300,000 daily bbl each, gas dehydration, crude inlet manifolds and the flare gas system. | * **Saipem:** EPC (engineering, procurement and construction) of three gas/oil separation trains (GOSP) with a capacity of 300,000 daily bbl each, gas dehydration, crude inlet manifolds and the flare gas system. | ||
− | + | === History === | |
* 2008 - GS E&C Consortium was awarded U$501 million Manifa Gas Facilities contract | * 2008 - GS E&C Consortium was awarded U$501 million Manifa Gas Facilities contract | ||
* 2008 - Saipem awarded contract for three gas/oil separation trains | * 2008 - Saipem awarded contract for three gas/oil separation trains | ||
* 2013 - Manifa project starts first phase of production | * 2013 - Manifa project starts first phase of production | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[JGC Oil And Gas Processing References]] | # [[JGC Oil And Gas Processing References]] | ||
# [[Saipem Gas And Oil Production And Treating Facilities References]] | # [[Saipem Gas And Oil Production And Treating Facilities References]] | ||
+ | # [[Saipem Gas Gathering And Conditioning References]] | ||
# [http://killajoules.wikidot.com/archive:gs-e-c-consortium-wins-saudi-gas-plant/ GS E&C Consortium Wins Saudi Gas Plant] | # [http://killajoules.wikidot.com/archive:gs-e-c-consortium-wins-saudi-gas-plant/ GS E&C Consortium Wins Saudi Gas Plant] | ||
# [http://killajoules.wikidot.com/archive:saipem-awarded-new-onshore-contracts-in-saudi-arabia Saipem awarded new onshore contracts in Saudi Arabia and Nigeria worth approximately 1.6 billion euro] | # [http://killajoules.wikidot.com/archive:saipem-awarded-new-onshore-contracts-in-saudi-arabia Saipem awarded new onshore contracts in Saudi Arabia and Nigeria worth approximately 1.6 billion euro] |
Latest revision as of 17:19, 3 March 2024
Summary Information
- Operator: Saudi Aramco
- Country: Saudi Arabia
- Location: Khursaniyah, about 50km northwest from Al Jubail, eastern Saudi Arabia
- Production start: 2013
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume: 900,000 bpd
Description
- The Manifa field includes dry-land rigs linked by a total of 41 kilometers of causeways with a number of elevated bridges designed to maintain natural water flow in the Manifa Bay and preserving natural marine nurseries.
- The crude oil processing facilities have 900,000 bpd capacity
Contractors
- **GS E&C Consortium:** Manifa Gas Facilities
- **Saipem:** EPC (engineering, procurement and construction) of three gas/oil separation trains (GOSP) with a capacity of 300,000 daily bbl each, gas dehydration, crude inlet manifolds and the flare gas system.
History
- 2008 - GS E&C Consortium was awarded U$501 million Manifa Gas Facilities contract
- 2008 - Saipem awarded contract for three gas/oil separation trains
- 2013 - Manifa project starts first phase of production
Geology
Links
- JGC Oil And Gas Processing References
- Saipem Gas And Oil Production And Treating Facilities References
- Saipem Gas Gathering And Conditioning References
- GS E&C Consortium Wins Saudi Gas Plant
- Saipem awarded new onshore contracts in Saudi Arabia and Nigeria worth approximately 1.6 billion euro
- Manifa project starts first phase of production