Difference between revisions of "Mangalore LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...") |
Abarrelfull (talk | contribs) |
||
Line 7: | Line 7: | ||
* Status: | * Status: | ||
=== Brief Description === | === Brief Description === | ||
− | + | * The terminal will have an initial capacity of 4 Million Tonnes Per Annum (MTPA), and the potential for expansion up to 8 MTPA | |
+ | * In addition, this import and regasification terminal would also have the ISO LNG containerisation and LNG truck loading facility | ||
=== Technical Details === | === Technical Details === |
Revision as of 07:47, 27 June 2022
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status:
Brief Description
- The terminal will have an initial capacity of 4 Million Tonnes Per Annum (MTPA), and the potential for expansion up to 8 MTPA
- In addition, this import and regasification terminal would also have the ISO LNG containerisation and LNG truck loading facility
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers:
History
- 200X -
Other Information
-