Difference between revisions of "Malaysia LNG Terminal Train 9"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Ownership: Petronas * Website: http://www.petronas.com.my/ * Location: Bintulu, Sarawak, Malaysia * Capacity: 3.6 million tons/annum * Status...")
 
Line 8: Line 8:
  
 
=== Brief Description ===
 
=== Brief Description ===
* A single train expansion to the existing [[[Malaysia Lng Terminal]]]
+
* A single train expansion to the existing [[Malaysia LNG Terminal]]
  
 
=== Technical Details ===
 
=== Technical Details ===

Revision as of 17:13, 26 June 2022

Summary Information

  • Ownership: Petronas
  • Website: http://www.petronas.com.my/
  • Location: Bintulu, Sarawak, Malaysia
  • Capacity: 3.6 million tons/annum
  • Status: Under Construction

Brief Description

Technical Details

  • Storage capacity:
  • Constructor:
* **Chiyoda – Saipem** Joint Venture awarded contract for FEED
* **JGC Corporation:** Engineering, procurement, construction and commissioning (EPCC)
* **GE Oil & Gas** will supply turbocompression technology
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in [[[LNG Terminals to be Completed in 2015 | 2015]]]

Suppliers / Customers

  • Suppliers: Various offshore gas fields developed by PETRONAS
  • Customers:

History

  • 2012 - Chiyoda – Saipem Joint Venture awarded contract for FEED
  • 2012 - GE wins compressor contract
  • 2015 - JGC awarded EPCC contract

Other Information

  • -

Links

  1. Chiyoda LNG Feed References
  2. PETRONAS Selects GE Technology for the PETRONAS LNG Train 9 Project
  3. Chiyoda – Saipem Joint Venture awarded contract for FEED and EARLY WORKS for PETRONAS LNG Train 9 in Malaysia
  4. JGC Wins EPCC Contract for LNG Complex Expansion Project in Malaysia