Maclure Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Taqa
- Country: UK
- Location:
- Production start: 2002
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Maclure oil field started production in 2002 and was developed via a single subsea gas-lifted well tied back to Maersk’s Gryphon Oil Field Floating Production Storage and Offloading vessel.
- Gas is transported via the Scottish Area Gas Evacuation (SAGE) Pipeline to the SAGE St Fergus Gas Processing Terminal
+++ Contractors
- -
+++ History
- 2002 - Project development approved by UK Government
- 2002 - First production
- 2005 - Maersk acquires the field from Kerr-McGee
- 2012 - BP sells the field to Taqa
+++ Geology