Maclure Oil Field
Revision as of 15:54, 3 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Taqa * Country: UK * Location: * Production start: 2002 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +++ Descr...")
Summary Information
- Operator: Taqa
- Country: UK
- Location:
- Production start: 2002
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Maclure oil field started production in 2002 and was developed via a single subsea gas-lifted well tied back to Maersk’s Gryphon Oil Field Floating Production Storage and Offloading vessel.
- Gas is transported via the Scottish Area Gas Evacuation (SAGE) Pipeline to the Sage St Fergus Gas Processing Terminal
+++ Contractors
- -
+++ History
- 2002 - Project development approved by UK Government
- 2002 - First production
- 2005 - Maersk acquires the field from Kerr-McGee
- 2012 - BP sells the field to Taqa
+++ Geology
+++ Links