Difference between revisions of "Maclure Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Taqa * Country: UK * Location: * Production start: 2002 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +++ Descr...")
 
 
Line 11: Line 11:
 
+++ Description
 
+++ Description
 
* The Maclure oil field started production in 2002 and was developed via a single subsea gas-lifted well tied back to Maersk’s [[Gryphon Oil Field]] Floating Production Storage and Offloading vessel.
 
* The Maclure oil field started production in 2002 and was developed via a single subsea gas-lifted well tied back to Maersk’s [[Gryphon Oil Field]] Floating Production Storage and Offloading vessel.
* Gas is transported via the [[Scottish Area Gas Evacuation (SAGE) Pipeline]] to the [[Sage St Fergus Gas Processing Terminal]]
+
* Gas is transported via the [[Scottish Area Gas Evacuation (SAGE) Pipeline]] to the [[SAGE St Fergus Gas Processing Terminal]]
  
 
+++ Contractors
 
+++ Contractors

Latest revision as of 15:21, 16 October 2023

Summary Information

  • Operator: Taqa
  • Country: UK
  • Location:
  • Production start: 2002
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

+++ Contractors

  • -

+++ History

  • 2002 - Project development approved by UK Government
  • 2002 - First production
  • 2005 - Maersk acquires the field from Kerr-McGee
  • 2012 - BP sells the field to Taqa

+++ Geology

+++ Links

  1. UK Oil and Gas Fields by Approval Date
  2. The A.P. Moller - Maersk Group acquires UK North Sea oil and gas interests
  3. BP to Sell Package of Central North Sea Assets to Taqa for $1.1 Billion