Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Taqa * Country: UK * Location: * Production start: 2002 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +++ Descr...") |
Abarrelfull (talk | contribs) |
||
Line 11: | Line 11: | ||
+++ Description | +++ Description | ||
* The Maclure oil field started production in 2002 and was developed via a single subsea gas-lifted well tied back to Maersk’s [[Gryphon Oil Field]] Floating Production Storage and Offloading vessel. | * The Maclure oil field started production in 2002 and was developed via a single subsea gas-lifted well tied back to Maersk’s [[Gryphon Oil Field]] Floating Production Storage and Offloading vessel. | ||
− | * Gas is transported via the [[Scottish Area Gas Evacuation (SAGE) Pipeline]] to the [[ | + | * Gas is transported via the [[Scottish Area Gas Evacuation (SAGE) Pipeline]] to the [[SAGE St Fergus Gas Processing Terminal]] |
+++ Contractors | +++ Contractors |
Latest revision as of 15:21, 16 October 2023
Summary Information
- Operator: Taqa
- Country: UK
- Location:
- Production start: 2002
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Maclure oil field started production in 2002 and was developed via a single subsea gas-lifted well tied back to Maersk’s Gryphon Oil Field Floating Production Storage and Offloading vessel.
- Gas is transported via the Scottish Area Gas Evacuation (SAGE) Pipeline to the SAGE St Fergus Gas Processing Terminal
+++ Contractors
- -
+++ History
- 2002 - Project development approved by UK Government
- 2002 - First production
- 2005 - Maersk acquires the field from Kerr-McGee
- 2012 - BP sells the field to Taqa
+++ Geology
+++ Links