* Macedon gas development consists of four wells in approximately 180 meters (590 feet) water depth
 
* Macedon gas development consists of four wells in approximately 180 meters (590 feet) water depth
 
* Recoverable reserves for the Macedon field are between 400 and 750 billion cubic feet of gas.  
 
* Recoverable reserves for the Macedon field are between 400 and 750 billion cubic feet of gas.  
Line 15: Line 15:
 
* A sales gas pipeline will be connected to the [[Dampier to Bunbury Natural Gas Pipeline]] for sale to the domestic gas market in Western Australia
 
* A sales gas pipeline will be connected to the [[Dampier to Bunbury Natural Gas Pipeline]] for sale to the domestic gas market in Western Australia
  
=== Contractors
+
=== Contractors ===
 
* **McDermott:** EPCI - 20-inch pipeline, 8-inch main umbilical, infield umbilicals, flexible flowlines & associated subsea structures, MUTA, SUTAs, etc.), rigid jumpers, flying leads
 
* **McDermott:** EPCI - 20-inch pipeline, 8-inch main umbilical, infield umbilicals, flexible flowlines & associated subsea structures, MUTA, SUTAs, etc.), rigid jumpers, flying leads
 
* **Oceaneering :** 100 km (62 miles) of steel tube umbilicals and associated distribution equipment, including termination assemblies and flying leads
 
* **Oceaneering :** 100 km (62 miles) of steel tube umbilicals and associated distribution equipment, including termination assemblies and flying leads
Line 25: Line 25:
 
** 1 x Induced Gas Flotation Unit
 
** 1 x Induced Gas Flotation Unit
  
=== History
+
=== History ===
 
* 1992 - Macedon field discovered
 
* 1992 - Macedon field discovered
 
* 2010 - BHP Billiton Approves Macedon Gas Development
 
* 2010 - BHP Billiton Approves Macedon Gas Development
Line 36: Line 36:
 
* 2022 - Woodside becomes operator after BHP Billiton merger
 
* 2022 - Woodside becomes operator after BHP Billiton merger
  
=== Geology
+
=== Geology ===
 
*  
 
*  
  
=== Links
+
=== Links ===
 
# [[McDermott Platform References]]
 
# [[McDermott Platform References]]
 
# [[Process Group Oil And Gas Processing References]]
 
# [[Process Group Oil And Gas Processing References]]

Latest revision as of 07:56, 29 November 2023

Summary Information

  • Operator: Woodside
  • Country: Australia
  • Location: 17 kilometers off Onslow in North West Australia
  • Production start: 2013
  • Partners: Woodside - 71.43%, Santos - 28.57%
  • Type: Gas
  • Estimated Reserves: 400 and 750 billion cubic feet of gas
  • Production Volume:

Description

  • Macedon gas development consists of four wells in approximately 180 meters (590 feet) water depth
  • Recoverable reserves for the Macedon field are between 400 and 750 billion cubic feet of gas.
  • Project costs will be approximately US$1.5 billion
  • A sales gas pipeline will be connected to the Dampier to Bunbury Natural Gas Pipeline for sale to the domestic gas market in Western Australia

Contractors

  • **McDermott:** EPCI - 20-inch pipeline, 8-inch main umbilical, infield umbilicals, flexible flowlines & associated subsea structures, MUTA, SUTAs, etc.), rigid jumpers, flying leads
  • **Oceaneering :** 100 km (62 miles) of steel tube umbilicals and associated distribution equipment, including termination assemblies and flying leads
  • **Technip:** Onshore facilities consisting of a gas plant and pipelines works
  • **STREICHER-Clough:** Pipeline construction work - horizontal directional drilling, construction of an onshore wet gas pipeline and sales gas pipeline and umbilical installation
  • **Axens:** Mercury removal unit
  • **Process Group:** Water Treatment Package
    • 1 x Corrugated Plate Interceptor
    • 1 x Induced Gas Flotation Unit

History

  • 1992 - Macedon field discovered
  • 2010 - BHP Billiton Approves Macedon Gas Development
  • 2010 - Oceaneering awarded umbilicals contract
  • 2011 - Technip awarded contract for onshore facilities
  • 2011 - STREICHER-Clough awarded pipeline contract
  • 2013 - First gas produced
  • 2015 - Quandrant Energy acquired Apache's share
  • 2018 - Santos acquired Quadrant Energy
  • 2022 - Woodside becomes operator after BHP Billiton merger

Geology

Links

  1. McDermott Platform References
  2. Process Group Oil And Gas Processing References
  3. Oceaneering Announces BHP Billiton Umbilical and Distribution Equipment Contract
  4. Technip awarded contract for onshore gas project in Australia
  5. STREICHER–Clough Joint Venture awarded new contract
  6. BHP Billiton Approves Macedon Gas Development In Western Australia
  7. BHP Billiton Celebrates First Gas at Macedon
  8. Axens’ Mercury Removal Products Selected for Macedon
  9. Apache Agrees To Sell Australian Operations For $2.1 Billion
  10. Santos announced today the acquisition of 100% of Quadrant Energy
  11. Woodside Completes Merger with BHP Petroleum