  1. Kencana HL Sdn Bhd Hook-up Commissioning for Platform Upgrading, Revisit & IO Modification for Samarang Redevelopment Project (Phase 2) September 2012/ 2 months
  2. South Angsi Oil Field
    • Malaysia
    • Petronas Carigali Sdn Bhd (PCSB)
    • Detailed Design for Angsi Facilities Upgrading Project - Booster Compression Module
    • July 2012/ 8 months
  3. Petronas Carigali Sdn Bhd (PCSB) Design & Engineering Services for SKO Pipelines & Facilities Rejuvenation Project July 2012/ 3 years
  4. Sarawak Gas Project
    • Malaysia
    • Murphy
    • Front End Engineering & Design for Belum Topside Facility
    • July 2012/ 3 months
  5. Bukit Tua FPSO
    • Indonesia
    • M3NERGY Offshore Limited
    • Process Topsides Front End Engineering Design (FEED)
    • July 2012/ 5 months
  6. Angsi Oil And Gas Field
    • Malaysia
    • Petronas Carigali Sdn Bhd (PCSB-SBO)
    • Front End Engineering Design Services for Angsi CEOR Project
    • July 2012/ 4 months
  7. Petronas Carigali Sdn Bhd (PCSB) Front End Engineering Design Services for Dalak Pipeline Project June 2012/ 5 months
  8. Sarawak Oil Project
    • Malaysia
    • Murphy
    • Front End Engineering and Design for PERMAS Field Substructure, Topside and Pipeline
    • February 2012 / 4-5 months
  9. Sarawak Shell Berhad Conceptual and Detail Design for Beryl Development on Hip February 2012 / 3 months
  10. IEV Engineering Sdn Bhd Provision of Detail Design Engineering for D35 Host Tie -In February 2012 / 2 months
  11. East Belumut Oil Field
    • Malaysia
    • Newfield
    • Provision of Engineering Design for Equipment and System Enhancement for East Belumut - A Platform
    • January 2012 / 8 weeks
  12. Sabah Shell Petroleum Company Limited St. Joseph ASP Pilot Pre-Feed Design CTR # Platform Modification & Well Tie - In for Sabah Shell Petroleum Company Limited October 2011 / 3 months
  13. Schlumberger MPFM on Samarang - Detail Design for Temporary MPFM & Associate Items (SMJT-F) September 2011 / 1 month
  14. Talisman Malaysia Limited Work Released for WHRP Tripod Front End Engineering Design (FEED) August 2011 / 2 months
  15. Petronas Carigali Sdn Bhd (PCSB-SBO)
  16. Provision of Detailed Design for Pipeline Chemical Injection Facilities
  17. July 2011 / 3 months
  18. Temana Oil Field
    • Petronas Carigali Sdn Bhd (PCSB)
    • Provision of Front End Engineering Design Services and Detail Design Services (Optional) for Temana Redevelopment Project
    • July 2011 / 14 months
  19. Angsi Oil And Gas Field
    • Malaysia
    • Petronas Carigali Sdn Bhd (PCSB)
    • Provision of Design and Engineering Services on the Basic Engineering Study for Angsi Chemical Enhanced Oil Recovery (CEOR) Project
    • July 2011 / 12 weeks
  20. Newfield Peninsula Malaysia
  21. Provision of Topside Detailed Design and Engineering Services for PM323 Tinggi-A To Tiong –A Oil Evacuation Pipeline Project
  22. June 2011 / 16 weeks
  23. Petronas Carigali Sdn Bhd (PCSB)
  24. Provision of Post Feed Design for D21 Development Project.
  25. June 2011 / 3 months
  26. Tapis Oil Field
    • Shapadu Energy & Engineering
    • Tapis EOR Brownfield Modifications and Retrofits Project
    • June 2011 / 12 months
  27. Kencana HL Sdn Bhd
  28. South West Ampa Gas Field
    • Brunei
    • Shell
    • Detailed Design for Ampa-9 HP Compressor Module Project - EPC
    • May 2011 / 7 months
  29. Cendor Oil Field
    • Malaysia
    • PETROFAC
    • Provision of Engineering Support Services for Cendor Phase 2 Development Project, Block PM304
    • March 2011 / 12 months

Petronas Carigali Sdn Bhd (PCSB) Provision of Conceptual and Front End Engineering Design Services for Samarang Integrated Operation (IO) Project February 2011 / 5 months

  1. Berantai Gas Field
    • Malaysia
    • Kencana Bestwide Sdn Bhd
    • Detailed Design Engineering Work for Wellhead Platform Topside for Berantai Development
    • January 2011 / 3 months

Petronas Carigali Sdn Bhd (PCSB-SKO) Provision of Detailed Design for Installation of Permanent Pump Oil from Oil Tank into Trunkline at SMR-A & Installation of Diesel & Water Bunkering Line at KINDP-A January 2011

  1. Sepat Oil Field
    • Malaysia
    • Kencana HL Sdn Bhd
    • Sepat Early Production System Project (MOPU) Structural Layout Study & Other Analysis
    • November 2010 / 1 month
  2. Newfield Peninsula Malaysia
  3. Provision of Engineering Design Services for Facilities Enhancement & Modification
  4. November 2010
  5. Petronas Carigali Sdn Bhd (PCSB-SKO)
  6. Provision of Piping and Instrumentation Diagrams (P&ID) As Builting and Operating Procedure Manual (OPM) Updating for Bintulu Crude Oil Terminal (BCOT), Temana and Bayan
  7. September 2010 / 12 months
  8. Baram Delta Oil And Gas Fields
    • Petronas Carigali Sdn Bhd (PCSB-SKO)
    • Provision of Piping and Instrument Diagram (P&ID) As Building and Operating Procedure Manual (OPM) Updates for Tukau and Siwa Fields
    • September 2010 / 7 months
  9. Carigali PTTEPI Company Sdn Bhd (CPOC)
  10. Engineering Services for Front End Engineering Design (FEED) and Follow-On Engineering of Phase-2 Wellhead Platrforms (MDE, MDF and JKB) and Pipelines
  11. September 2010 / 20 weeks
  12. Petronas Carigali Sdn Bhd (PCSB)
  13. Provision of Engineering Revisit for Erb West Development Project
  14. August 2010 / 5 months
  15. Petronas Carigali Sdn Bhd (PCSB-SKO)
  16. Baram Delta Oil And Gas Fields
    • Provision of New Pedestal Cranes at Baram and Betty Field
    • July 2010 / 12 weeks
  17. Baram Delta Oil And Gas Fields
    • Petronas Carigali Sdn Bhd (PCSB-SKO)
    • Provision of Operational HAZOP for Baram And Fairley Baram Field
    • May 2010 / One off
  18. Petronas Carigali Sdn Bhd (PCSB) Provision of Conceptual and FEED For Semarang Redevelopment Phase 2 April 2010 / 8 months
  19. Petronas Carigali Sdn Bhd (PCSB-SKO) Provision of Engineering For Relocating Gas Detector at D35 For PCSB-SKO August 2009 / 14 Weeks
  20. East Belumut Oil Field
    • Malaysia
    • Newfield
    • Provision of Engineering Services for Topside Modifications at East Belumut
    • March 2009 / 4 months
  21. Exxon Mobil Exploration & Production FEED Study And Detailed Design For GUE Buttlist Project March 2009 / 6 weeks
  22. Lawit A Gas Field
    • Malaysia
    • Exxon Mobil
    • Detailed Design For Lawit A Compressor Restage Project
    • October 2008 / 6 months
  23. F28 Gas Field
    • Sarawak Shell Bhd (SSB)
    • Conceptual Design & Detailed Design For F6 Tie-In for F28 Development Project
    • May 2008 / 10 months
  24. PCPP Operating Co. Sdn Bhd Conceptual, FEED And Detail Design For D1 Cluster Development Project March 2008 / 3 months
  25. Layang Gas Field
    • Nippon Oil Exploration
    • Layang Development Project
    • May 2008 / 6 months
  26. Sarawak Shell Bhd (SSB) Conceptual Design And Detailed Design of St. Joseph Re-Development Project October 2007 / 12 months
  27. B11 Gas Field
    • Petronas Carigali Sdn Bhd (PCSB) / Malaysia Marine & Heavy Engineering
    • Engineering, Procurement & Construction (EPC) of PC4 Drilling Platform As Part of PC4 Gas Development Project
    • September 2006 / 22 months
  28. B11 Gas Field
    • Petronas Carigali Sdn Bhd (PCSB)
    • Front End Engineering Design Services For PC4 Wellhead Drilling Platform Gas Development Project
    • October 2006 / 2 months
  29. Kumang Cluster Gas And Condensate Fields
    • Malaysia
    • Petronas Carigali
    • Provision of Conceptual Design and Engineering Services for Kumang Cluster Development
    • July 2006 / 4 months
  30. Angsi Oil And Gas Field
    • Malaysia
    • Petronas Carigali Sdn Bhd (PCSB)
    • Provision For Engineering Design Services For Angsi IV Development, Procurement, Assistance And Post-AFC Support Services
    • July 2006 / 12 months
  31. D35, D21, J4, PSC Oil And Gas Fields
    • Malaysia
    • Petronas Carigali Sdn Bhd (PCSB)
    • Front End Engineering Design (FEED) J4 & D21 Field Development Project
    • April 2006 / 4 months
  32. Petronas Carigali Vietnam Ltd (PCV) Provision of Conceptual and Basic Engineering Services for Pearl Development Project March 2006 / 6 months
  33. PM-3 CAA Oil And Gas Fields
    • Malaysia
    • Talisman
    • Provision of Detailed Design of Bunga Kekwa 'C' (BK-C) Annex Topside
    • January 2006 / 2 months
  34. PM-3 CAA Oil And Gas Fields
    • Malaysia
    • Talisman
    • Provision of Detailed Design of Bunga Kekwa 'C' (BK-C) Annex Substructure
    • January 2006 / 2 months
  35. Temana Oil Field
    • Malaysia
    • Petronas Carigali Sdn Bhd / Vastalux
    • Detailed Design For Temana (TEJT-T, TEJT-W & TEJT-C) Platforms Revisit 2
    • December 2005 / 4 months
  36. East Belumut Oil Field
    • Malaysia
    • Newfield
    • Provision for Front End Engineering Design Services For Block PM323 Project (East Belumut & Chermingat Platforms)
    • December 2005 / 3 months
  37. Petronas Carigali Sdn Bhd / Vastalux Detailed Design For ERB West (EWDP-B) Platform Revisit 2 September 2005 / 2 months
  38. Bumi Bulan And Suriya Gas Fields
    • Malaysia / Thailand
    • Carigali-Triton Operating Company Sdn Bhd (Hess)
    • FEED For Bumi, Bulan & Suriya Gas Field Development
    • May 2005 / 6 months
  39. Sarawak Shell Bhd (SSB) B12 Subsea Wellhead Conceptual and Detailed Design September 2004 / 8 months
  40. ExxonMobil / Petra Resources Sdn Bhd Procurement & Fabrication Services Associated With GU-E Host Tie-Ins September 2004 / 3months
  41. Qatar Petroleum / Tenaga Nazar Sdn Bhd
  42. Engineering Design For EPCC of NF-A (PS-4) Topside Upgrade Detailed Design for Topsides Upgrade of The Following Platforms (Utility Platforms, Riser Treatment Platform, Flare Platform)
  43. August 2004 / 6 months
  44. Petronas Carigali Sdn Bhd Conceptual and Detailed Engineering Design Services Interconnecting Pipelines and Tie-Ins to Existing Facilities/Pipeline August 2004 / 6 months

+++ Link