Difference between revisions of "Luanda Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 19: | Line 19: | ||
=== Products Produced === | === Products Produced === | ||
* - | * - | ||
− | === | + | === Projects === |
− | * | + | * A new Naphtha Hydrotreater and Platformer Unit are being constructed at the refinery |
+ | * See [[Luanda Refinery Upgrade Project]] for details | ||
=== Other Information === | === Other Information === | ||
* - | * - | ||
Line 26: | Line 27: | ||
* 2007 - Sonangol acquire Total's stake | * 2007 - Sonangol acquire Total's stake | ||
* 2012 - Capacity was increased to 65,000 bpd from 39,000 bpd | * 2012 - Capacity was increased to 65,000 bpd from 39,000 bpd | ||
+ | * 2019 - Upgrade project launched | ||
+ | |||
=== Relevant Links === | === Relevant Links === | ||
− | + | # [http://killajoules.wikidot.com/archive:luanda-refinery-production-increases Luanda refinery production increases] | |
− | |||
− |
Revision as of 18:32, 17 March 2020
Contents
Summary Information
- Ownership: Sonangol
- Website: http://www.sonangol.co.ao/
- Location: Luanda
- Capacity: 3.25 million tons/annum & 65,000 bbl/day
- Nelson Complexity:
Refining Units
- Crude unit 35,000
- Vacuum unit 2,500
- Catalytic reformer 1,900
- Catalytic hydro desulphuriser 2,800
- Pre kero / distillate hydrotreater 3,500
- Asphalt (t/d) 950
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The refinery processes local Angolan crudes from mainly Kwanza and Palanca
Products Produced
- -
Projects
- A new Naphtha Hydrotreater and Platformer Unit are being constructed at the refinery
- See Luanda Refinery Upgrade Project for details
Other Information
- -
History
- 2007 - Sonangol acquire Total's stake
- 2012 - Capacity was increased to 65,000 bpd from 39,000 bpd
- 2019 - Upgrade project launched