Difference between revisions of "Longkou Nanshan LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
=== Brief Description === | === Brief Description === | ||
− | + | * A five million tons per annum onshore terminal with four LNG tanks | |
+ | * Each 220,000 cubic metre storage tank has a single bearing platform with a diameter of 93.4 metres and a tank height of 60.4 metres. | ||
+ | * It includes one dedicated LNG loading and unloading terminal (maximum berthing of 266,000m3 ships) | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 4*220,000 M3 |
− | * Unloading capacity: | + | * Unloading capacity: 266,000m3 ships |
− | * Send out capacity: | + | * Send out capacity: 40 million cubic metres per day |
* Constructor: | * Constructor: | ||
− | * | + | ** CNOOC Offshore Oil Engineering: Construction of the tanks |
+ | |||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | + | * The terminal is under construction | |
+ | * Commissioning is scheduled for completion in [[LNG Terminal Projects to be Completed in 2023 | 2023]] | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
Line 27: | Line 31: | ||
=== History === | === History === | ||
− | * | + | * 2020 - Construction was launched |
=== Other Information === | === Other Information === | ||
Line 33: | Line 37: | ||
- | - | ||
=== Links === | === Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2022/01/the-civil-works-for-storage-tank-of.html The Civil Works for the Storage Tank of Longkou LNG Project Kicks off Successfully] |
+ | # [https://lng-news.blogspot.com/2021/12/tank-roofs-raised-on-all-four-220000.html Tank Roofs raised on all four 220,000 cubic meters storage tanks of the Longkou LNG project] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:China]] | ||
+ | [[category:PipeChina]] |
Latest revision as of 17:06, 6 January 2022
Contents
Summary Information
- Ownership: PipeChina
- Website: https://www.pipechina.com.cn/
- Location: Longkou Port District, Yantai City, Shandong Province
- Capacity: 5.0 million tons/annum
- Status: Under construction
Brief Description
- A five million tons per annum onshore terminal with four LNG tanks
- Each 220,000 cubic metre storage tank has a single bearing platform with a diameter of 93.4 metres and a tank height of 60.4 metres.
- It includes one dedicated LNG loading and unloading terminal (maximum berthing of 266,000m3 ships)
Technical Details
- Storage capacity: 4*220,000 M3
- Unloading capacity: 266,000m3 ships
- Send out capacity: 40 million cubic metres per day
- Constructor:
- CNOOC Offshore Oil Engineering: Construction of the tanks
Ongoing Projects/Project Status
- The terminal is under construction
- Commissioning is scheduled for completion in 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2020 - Construction was launched
Other Information
-