Livorno LNG Terminal
Revision as of 14:36, 8 July 2022 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: OLT Offshore LNG Toscana (IREN GROUP, E.ON GROUP) * Website: http://www.oltoffshore.it/ * Location: Livorno, Tuscany, Italy * Capaci...")
Summary Information
- Ownership: OLT Offshore LNG Toscana (IREN GROUP, E.ON GROUP)
- Website: http://www.oltoffshore.it/
- Location: Livorno, Tuscany, Italy
- Capacity: 3 million tons/annum
- Status: In operation
+++ Brief Description
- The terminal a floating regasification unit, created by modifying an LNG carrier, which is positioned 22 km offshore the Tuscan coast and is connected to dry land by a 30 km long pipeline for the transfer of the gas to the national distribution system.
- The vessel is moored with an external turret in 120 m water depth
- The vessel Golar Frost was converted
+++ Technical Details
- Storage capacity: 137,500 cubic metres
- Unloading capacity:
- Send out capacity: 3.75 billion cubic meters a year
- Constructor:
* **Saipem:** Conversion of the gas carrier ship, offshore installation and commissioning * **Drydocks World:** Vessel conversion * **London Marine:** Turret Mooring System
+++ Ongoing Projects/Project Status
- Completed in [[[LNG Terminals to be Completed in 2013 | 2013]]]
+++ Suppliers / Customers
- Suppliers:
- Customers: OLT has signed a deal with the city of Livorno to supply gas
+++ History
- 2004 - The project received its final environmental approval
- 2008 - Vessel purchased from Golar LNG
- 2008 - Saipem awarded conversion & installation contract
- 2010 - Offshore pipeline laying completed
- 2013 - FSRU is commissioned
+++ Other Information
- -
Links
- London Marine FPSO References
- Saipem LNG References
- Saipem FPSO References
- Saipem Europe Pipeline References
- International Protective Coatings Floating Platform Referenc
- Floating Storage & Regasification Unit, Golar LNG
- Livorno FSRU Project - Golar Frost Sale
- Saipem awarded new Offshore contract worth 390 million euro
- The offshore works which concerned laying and burying the offshore pipeline were ended as scheduled
- Fairmount Tugs Deliver Floating 'Gas Plant' Toscana
- Commissioning of the Terminal “FSRU Toscana” is proceeding
- Testing activities of the Terminal "FSRU Toscana" are going to be completed
- The commercial activities of the Terminal; FSRU Toscana; has been started