Difference between revisions of "Lincolnshire Offshore Gas Gathering System (LOGGS)"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 28: | Line 28: | ||
+++ History | +++ History | ||
* 1988 - Pipeline operations begin | * 1988 - Pipeline operations begin | ||
+ | * 2019 - Chrysaor became the owner after acquiring ConocoPhillips North Sea business | ||
+ | * 2021 - Chrysaor submitted plans to decommission and remove the LOGGS installation | ||
+ | * 2023 - Viking CCS project launched using LOGGs | ||
+++ Other Information | +++ Other Information | ||
Line 34: | Line 37: | ||
+++ Links | +++ Links | ||
# [https://www.og.decc.gov.uk/web_files/ems/2012/ConocoPhillips-ems.pdf Conocophillips, UK Upstream Environmental Statement 2011] | # [https://www.og.decc.gov.uk/web_files/ems/2012/ConocoPhillips-ems.pdf Conocophillips, UK Upstream Environmental Statement 2011] | ||
+ | # [[FoundOcean Europe Subsea References]] | ||
+ | # [[HSM Offshore Platform References]] | ||
# [[List Of Oil and Gas Production Platforms In The UK]] | # [[List Of Oil and Gas Production Platforms In The UK]] | ||
− | # [ | + | # [https://abarrelfull.blogspot.com/2023/10/conocophillips-completes-27-billion.html ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries] |
− |
Latest revision as of 14:28, 9 November 2023
Summary Information
- Source: Southern North Sea
- Destination: Theddlethorpe Gas Processing Plant
- Ownership: Conocophillips
- Website:
- Length: kilometres ( miles)
- Capacity: per day
- Status: Operating
+++ Details
- There are four small steel platforms, the accommodation platform, Compression Platform, Production Platform and Riser Platform. Only the Riser platform is unmanned
- The system gathers gas from a large number of fields in the Southern North Sea and transports it to the Theddlethorpe Gas Processing Plant
+++ Contractors
- **Seaway Heavy Lifting:** LOGGS Riser Platform
++++ Related Gas Fields
- The facility receives natural gas from the V-fields;
- The Saturn Area Gas Fields, Mimas and Tethys Gas Fields:
- Saturn, Mimas and Tethys;
- The Jupiter Area natural gas fields:
- Ganymede, Sinope, Callisto, Europa and NW Bell;
- As well as the third-party fields:
- Ann, Alison, Annabel, Audrey, Anglia, Viking, Victor, Vixen and Victoria
+++ History
- 1988 - Pipeline operations begin
- 2019 - Chrysaor became the owner after acquiring ConocoPhillips North Sea business
- 2021 - Chrysaor submitted plans to decommission and remove the LOGGS installation
- 2023 - Viking CCS project launched using LOGGs
+++ Other Information
- HSM Offshore built the Accommodation Platform
+++ Links