Lianzi Oil Field
Revision as of 10:30, 20 October 2023 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Chevron
- Country: Angola
- Location:
- Production start: 2015
- Partners: Total 37%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Located 65 miles (105 km) offshore in approximately 3,000 feet (900 meters) of water, the Lianzi field will be developed via a tieback to the existing Benguela Belize Lobito Tomboco (BBLT) platform
- The £1.2 billion (US$2.0 billion) Lianzi development will include a subsea production system and a 27- mile (43 km) electrically heated flowline, the first of its kind at this water depth.
+++ Contractors
- **Subsea 7:**
- EPIC SURF contract
- EPCI topside contract
- **GE:** Supply of seven trees, nine subsea control modules (SCMs), topside and subsea controls distribution equipment and vertical connection systems
- **KBR:** Topsides design including multiple equipment packages
- **Nexans:** DEH Engineering Study
+++ History
- 2004 - Lianzi Oil Field discovered
- 2012 - Chevron Sanctions the Lianzi Project
- 2012 - Subsea 7 awarded SURF and Topside contracts
- 2015 - First oil produced
+++ Geology
+++ Links
- Nexans Norway Umbilical References
- ChevronTexaco Announces Deepwater Oil Discovery in the Shared Angola/Congo Zone
- Chevron Sanctions the Lianzi Project Offshore Angola and the Republic of Congo
- GE Wins US$165 Million Contract to Supply Subsea Technology for Chevron Oil Project in West Africa
- Subsea 7 S.A. awarded Lianzi contract
- Subsea 7 S.A. awarded $150 million Lianzi topside contract
- KBR Awarded Subsea 7 Topsides Contract for Chevron Lianzi Offshore Project
- Chevron Announces First Production from the Lianzi Development Offshore the Republic of Congo and Angola