Lewek EMAS FPSO
Jump to navigation
Jump to search
Summary Information
- Name: Lewek Emas FPSO
- Field: Chim Sao Oil Field
- Country: Vietnam
- Ownership: EMAS
- Website:
- Operated By: Premier Oil
- Capacity: 50,000 bpd
- Year of Completion: 2011
+++ Brief Description
- The FPSO is utilised for the Chim Sáo Oil Field and will also be used for the Dua Oil and Gas Field
- The new FPSO, was converted from a 168,000dwt tanker
+++ Contractors
- **Keppel:** Conversion of a 168,000 dwt Suezmax tanker into an FPSO
- **EMAS:** Provided Lewek EMAS, a 180kdwt FPSO unit equipped with oil and gas processing facilities including water injection and gas export with 50,000 bopd production
- **DPS Global:** FPSO - Power Generation, Heating/Cooling Medium, Water Injection, Flare Knock Out, Production Separation / PWT, Module Yard Supervision, Detailed Design, FEED
- **Bluewater:** Swivel Stack
- **London Marine:** Turret Mooring System
+++ Status
- In operation
+++ History
- 2009 - Keppel awarded conversion contract
- 2011 - Lewek Emas FPSO delivered
- 2012 - EOC Limited awarded a contract to modify FPSO for Dua Oil and Gas Field tie back
+++ Other Information
- -
+++ Links